Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
09/07/2012

Home Automation - Security Alarm / Fire Alarm - How Can They Work Together?

Construction News Image
Household Automation explores how British Standards allow for a security alarm to act as a fire alarm.

Most security and home automation systems are able to connect to smoke, heat and Co2 detectors to provide warnings of fire, Household Automation explores the viable possibilities using British Standard BS 5839-6:2004.

Most of the major fire detection equipment manufacturers such as AICO and Hockiki offer a range of detector heads that can be connected using 9-24V power from a home automation or alarm panel and provide NC or NO contacts to enable an alarm. In practice this may be very easy to physically achieve but under what circumstances is this allowable?

The details of what is allowable is defined in British Standard BS 5839-6:2004 Fire detection and fire alarm systems for buildings.

A home automation or security system that is used as a fire alarm is classed as Grade C.

- A Grade C system is allowable in a three storey or less single family dwelling and shared house with no floor greater in area than 200m/sq (2,152 sq/ft).

- A Grade C system is allowable in a bungalow, flat or other single storey family dwelling or shared house with one floor greater than 200m/sq (2,152 sq/ft).

So now that we have established where the home automation or security alarm can be used as a fire alarm what are the key points that we need to know in order to comply with a grade C system?

- The fire alarm system has to be defined by category and grade and documentation (sample certificates provided at the back of the standard) provided upon commissioning.

-- Advertisement --
hss

- Battery life – section 15.4 specifically has notes relating to extended standby battery life of 72h (which is a greater requirement than a standard security system).

- Sounders should comply with section 13 - notably 75 dB(A) at the bed head.

- Control and indication – the standard suggests that grade C systems may have more sophisticated means of control comparable with grade A and B systems, its indicates that there is a need to ensure that the system is not compromised as a result of casual tampering with the control and indicating equipment (section 17.1). Further section 17.4 provides greater details of illuminated indicators and audible warnings.

In reality if you are using a home automation system as a fire alarm you need to read and comply with the whole of BS 5839-6:2004. As with any standard there are sections that are very clear and precise and others that are open for interpretation. BS 5839-6: 2004 does however clearly allow the use of systems other than fire alarms to act as fire alarms. This article is by no means comprehensive; we have provided an overview of what is possible. We strongly recommend that anybody looking at installing smoke / fire alarms using a home automation or security system as the main control and interface panel should obtain and comply with the recommendations of BS 5839-6:2004.

Household Automation Ltd has ongoing projects involving the installation of a variety of home automation equipment. We have used the Comfort home automation system as a fire alarm and can provide details of the types of system that would be appropriate for your home. The use of the Comfort system allowed the customer to set up dial out to his mobile (or tel number of his choice) as well as overall control from iPhone or iPad.

For other news Stories Matching Household Automation: News Archive Household Automation.

For the Household Automation build home page: News Archive Household Automation

For advice on the best way to integrate your home go to www.household-automation.co.uk contact us direct. Tel: 0844 8266 556 or e-mail: info@household-automation.co.uk

For more information regarding the Cytech Comfort Intelligent Home control system visit: www.cytech.biz

Latest Construction News

20/12/2024

Norwich City Council has acquired the Anglia Square Shopping Centre, paving the way for a transformative redevelopment of the prominent city site. This marks a key milestone in the Council's plan to rejuvenate the area, creating a vibrant hub with approximately 1,100 new homes, business ...
20/12/2024

SSE Energy Solutions (SSE), has signed an agreement to collaborate with Darlington Borough Council (DBC) to support the development of a town-wide heat network. While the project is in the early stages of development, SSE's current plans include constructing an Energy Centre containing large air ...
20/12/2024

Hubexo has opened its new UK and Ireland office, located next to the iconic Blackfriars Bridge in central London. The new office will serve as a dynamic base for Hubexo's teams across its UKI products, including Glenigan and NBS, as well as global Hubexo colleagues. The centrally located space ...
20/12/2024

Six social housing residents in Exeter have become the first in the UK to move into homes with no energy bills for at least five years, thanks to Octopus Energy's 'Zero Bills' initiative. The homes, located in the Nexa Fields development, are powered by cutting-edge green technology, including ...
20/12/2024

South Cambridgeshire District Council has granted planning permission for up to 4,500 new homes at Waterbeach, marking a major step in the development of the area into a new town. The outline permission, issued to RLW Estates, includes plans for housing as well as business, retail, community, ...
20/12/2024

A joint venture between Siemens Mobility and Costain is set to be awarded a major contract to deliver high-voltage (HV) power supply systems for HS2, the high-speed rail project connecting London to the West Midlands. The contract covers the entire 225km route and represents a significant ...
19/12/2024

Norwich City Council has approved plans to install over 600 solar panels on the roof of Riverside Leisure Centre, marking a significant step towards reducing the building's energy costs and carbon footprint. Set to be installed in early 2024, the solar panels are expected to cut the leisure ...
19/12/2024

The latest images of the transformational Stockton Waterfront urban park have been revealed, marking one year since work began on the project. Led by Esh Construction and commissioned by Stockton-on-Tees Borough Council, the development is a cornerstone of the Council’s 25-year vision to reshape ...
19/12/2024

Caddick has reached a major milestone in the construction of Ark 42, a 42,594 sq ft speculative industrial and logistics development at Trafford Park Road, with the steel frame structure now complete. Commissioned by Trebor Developments on behalf of The Prudential Assurance Company and M&G Real ...
19/12/2024

Skanska has reached a major milestone on the M42 Junction 6 scheme near Birmingham, opening the A4545 link road and the new motorway junction 5a to traffic for the first time on Wednesday, December 18. The new 2.4km dual carriageway, part of a three-year project for National Highways, aims to ...
BRICOFLOR UKT & D Glazing And Installation LimitedThink Construction Skills Ltd.Efco UK LtdStuart CanvasLakeside HireAqua Direct LtdContainexNo Hydro123v Plc
Terms and Conditions
2024/12/26 20:50:41