Construction News
03/11/2009
Affordable Homes Gain 'Renewable' Grant
![Construction News Image](https://www.construction.co.uk/newsimages/HCA(43).gif)
An initiative aimed at increasing the use of renewable construction materials in affordable homes has been agreed by the Department of Energy and Climate Change (DECC) and the government's housing and regeneration body the Homes and Communities Agency (HCA).
DECC has provided funding under the Low Carbon Investment Fund, which will be administered through the HCA’s National Affordable Housing Programme. The funding is to create a series of greener homes designed to minimise environmental impact through the increased use of building materials from renewable sources.
Only homes that start on site during this financial year, achieve Level 4 or above of the Code for Sustainable Homes and use a very high proportion of construction materials from renewable sources such as timber frame, natural insulation and timber windows will be eligible for funding.
Developers will also be required to install smart meters to track energy use and monitoring will continue once residents have moved in to the homes.
Robert Napier, Chairman of the HCA said: "This is a highly significant stepping stone in the bid to create greener homes and using renewable materials is imperative to the future of house building. The funding will be a catalyst in helping to develop the skills and methods needed to create a low carbon economy."
This new partnership with DECC is an innovative way of ensuring we help house builders achieve greater levels of sustainability when providing high quality affordable homes for the people who need them.
The first three projects to receive funding from the HCA to construct homes from renewable materials and therefore help educate developers and RSLs on the use of these new materials and techniques, are:
£3m for Denmark Lane, Diss in Norfolk – a rural site being developed by Czero with Flagship Housing as the RSL partner. The scheme will include 114 homes built to Level 4 of the Code for Sustainable Homes, 102 of which will be affordable, due to start on site in November.
£840k for The Triangle in Swindon to deliver 42 affordable homes built to Level 4 of the Code for Sustainable Homes. Kevin McCloud’s development company, Hab Oakus, will start work on site in December and Greensquare Group is the RSL partner.
£320k for Blackditch, Oxfordshire, a rural scheme including 16 affordable homes built to Level 4 of the Code for Sustainable Homes, due to start on site in March 2010. The RSL is Cottsway Housing and a developer is yet to be selected.
Further schemes to receive a share of the £5m will be announced later this year and the first homes are due to be completed by March 2010. The intention is to fund the creation of affordable homes on around 6 sites through the use of renewable construction methods.
(CD/BMcC)
DECC has provided funding under the Low Carbon Investment Fund, which will be administered through the HCA’s National Affordable Housing Programme. The funding is to create a series of greener homes designed to minimise environmental impact through the increased use of building materials from renewable sources.
Only homes that start on site during this financial year, achieve Level 4 or above of the Code for Sustainable Homes and use a very high proportion of construction materials from renewable sources such as timber frame, natural insulation and timber windows will be eligible for funding.
Developers will also be required to install smart meters to track energy use and monitoring will continue once residents have moved in to the homes.
Robert Napier, Chairman of the HCA said: "This is a highly significant stepping stone in the bid to create greener homes and using renewable materials is imperative to the future of house building. The funding will be a catalyst in helping to develop the skills and methods needed to create a low carbon economy."
This new partnership with DECC is an innovative way of ensuring we help house builders achieve greater levels of sustainability when providing high quality affordable homes for the people who need them.
The first three projects to receive funding from the HCA to construct homes from renewable materials and therefore help educate developers and RSLs on the use of these new materials and techniques, are:
£3m for Denmark Lane, Diss in Norfolk – a rural site being developed by Czero with Flagship Housing as the RSL partner. The scheme will include 114 homes built to Level 4 of the Code for Sustainable Homes, 102 of which will be affordable, due to start on site in November.
£840k for The Triangle in Swindon to deliver 42 affordable homes built to Level 4 of the Code for Sustainable Homes. Kevin McCloud’s development company, Hab Oakus, will start work on site in December and Greensquare Group is the RSL partner.
£320k for Blackditch, Oxfordshire, a rural scheme including 16 affordable homes built to Level 4 of the Code for Sustainable Homes, due to start on site in March 2010. The RSL is Cottsway Housing and a developer is yet to be selected.
Further schemes to receive a share of the £5m will be announced later this year and the first homes are due to be completed by March 2010. The intention is to fund the creation of affordable homes on around 6 sites through the use of renewable construction methods.
(CD/BMcC)
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a