Andover-based Scorpion Power Systems has taken delivery of two bespoke tri-axle step frames from Andover Trailers for use as mobile emergency 1,250kVA diesel generators on behalf of a major international telecoms group.
The two new trailers are specially designed to hold a 9-metre-long, 17-tonne generator set on the main deck, while a 3,000-litre fuel tank and cable drum carrier are securely mounted on the neck. The hydraulic-powered carrier holds a total of 200 metres of cable to allow maximum flexibility when positioning the trailer on site.
This specialist application required the design of a custom-built trailer, which Andover Trailers’ bespoke service has made possible with the two Andover-based companies working closely together on the specification.
A company spokesman for Scorpion Power Systems, said: "Andover Trailers has been known to us as a local company for some time. This has been the first opportunity to work with them on one of our major projects. It has proved to be a total success. The trailers were perfect for the application."
The trailers are 12 metres long, finished in flint-grey paint and feature a square neck and square end, to suit the load they are carrying. Both are fitted with Granning axles and air suspension with a raise / lower control valve, together with a Knorr-Bremse EBS braking system which integrates ABS and ASR traction control into one electronic system.
They also both come equipped with an on-board Knorr-Bremse Trailer Information Module (TIM). This is an easy-to-use trailer-mountable or hand-held device that is able to provide valuable information for the operator/driver on axle group load, odometer and trip distance, voltage, air pressures, wheel sensor information and EBS diagnostics without the need of a PC. Having this unit on board means easy diagnosis of most in-service issues by the operator without the need to contact a specialist engineer.
Independent legs are also fitted at the front and rear of the trailer to ensure a level platform for operating the generator.
Scorpion Power Systems is part of shentongroup (correct), a family-owned partnership of four companies based in Andover. Established in 1987 as a supplier of diesel generators, it has now grown to specialise in integrated diesel and gas generator-based standby power systems, UPS (uninterrupted power systems) and CHP (combined heat and power) solutions.
For information on the heavy haulage and specialist transport solutions provided by Andover Trailers, contact Ivan Collins at Andover Trailers Ltd, Unit 75, Columbus Way, Walworth Industrial Estate, Andover, Hampshire, SP10 5NP. Tel: 01264 358 944 or E-mail: sales@andovertrailers.co.uk or Visit: www.andovertrailers.co.uk
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...
19/11/2024
McLaren Construction has commenced works at the first UK industrial scheme in the East Midlands for a joint venture with Garbe Industrial Real Estate GmbH and Invesco Real Estate. McLaren will oversee all aspects of construction for the £30 million project located in Shireoaks, Worksop - in the ...
19/11/2024
Pennyfarthing Homes has submitted a planning application for 74 new homes in Fordingbridge as part of its plans to build a neighbourhood of 342 homes on the northern edge of the Hampshire market town. The new development which is part of the wider scheme known as Forde Valley and follows ...