Mainland UK's first-ever desalination plant was opened today to provide "seriously water-stressed" London with a much-needed back-up supply to use in the event of a drought.
Powered by renewable energy, the Thames Gateway Water Treatment Works, at Beckton in east London, will, when required, turn a mixture of seawater and river water from the tidal River Thames into high-quality drinking water for up to one million Londoners.
Today's official opening, by The Duke of Edinburgh, marks the latest addition to Thames Water's long-term measures to ensure it can meet the demand for water. The ongoing replacement of London's leaky Victorian water mains has helped cut leakage by more than a quarter in the past five years. But that progress on its own is not enough to ensure London will have enough water in a drought.
The capital is classed by the Environment Agency as "seriously water-stressed", which means that demand could outpace supply in a long dry period.
With climate change threatening hotter, drier summers and an additional 700,000 people forecast to move to London by 2021, the new water works will be available to help provide the capital's supplies for the future - whatever the weather.
The key treatment process in desalination is reverse osmosis, which involves forcing salty water through extremely fine membranes. This tried-and-tested technology is used at 14,000 water treatment plants across the world and has kept crews on Royal Navy ships refreshed for decades.
However, while most reverse osmosis plants have one or two stages, which yield around half of the source water as drinking water, the £270 million Gateway works is the world's first-ever four-stage reverse osmosis system, yielding a far more efficient 85 per cent.
The works will only take in water on the outgoing tide, when it is a third as salty as normal seawater and so requires less energy to treat it.
Martin Baggs, Thames Water's Chief Executive, said: "People may wonder why we're equipping 'rainy' London with a desalination plant, something more often associated with the Middle East, southern Europe or ocean-going liners. But the fact is, London isn't as rainy as you might think - it gets about half as much rain as Sydney, and less than Dallas or Istanbul. Water is an increasingly precious resource that we can no longer take for granted.
"Our existing resources - from non-tidal rivers and groundwater - simply aren't enough to match predicted demand in London. That's why we're tapping into the new and limitless resource of the tidal Thames, fed by the rolling oceans beyond, so we can ensure our 8.5 million customers have enough water in future in the event of a drought.
"The 2005/06 drought was too close for comfort, with only a very wet May saving the day, and we never want a repeat of that. It highlighted what we already knew: additional water sources are needed, as well as a lot more work on reducing leakage, to be sure we have sufficient supplies long-term.
"This new works is a major advance in desalination technology and in UK water resource management. Running it on biodiesel, derived from materials including used cooking oil, will also help us tread as lightly as possible on the environment, on which our core business depends."
(CD/GK)
Construction News
02/06/2010
New Water Works Taps Tidal Thames
.gif)

08/04/2025
McLaren Construction Midlands and North has officially announced its role in delivering the highly anticipated Birmingham England Temple for The Church of Jesus Christ of Latter-day Saints.
The project commenced with a ceremonial groundbreaking, attended by over 300 guests and live-streamed globall

08/04/2025
The University of Warwick's vision to create world-leading STEM facilities has taken a major step forward with the appointment of Kier as the preferred lead contractor to deliver Phase 1 of its STEM Connect Programme.
The announcement marks a significant milestone in the University's wider Connect

08/04/2025
Building work has officially commenced on a new Football Foundation PlayZone in Southwick.
The new multi-sport pitch is designed to offer football and basketball opportunities to people of all ages and abilities.
The development of the PlayZone has been made possible through a £198,076 grant from

08/04/2025
Avant Homes has announced the acquisition of a 20.1-acre site in Yaddlethorpe and received planning permission to deliver a new £45 million residential development including 200 homes.
Named Moorwell Meadows, the new development will be located off Scotter Road South and will feature a variety of t

08/04/2025
Applebridge Geoenvironmental, part of the Applebridge Family Construction Group, has been appointed for the Severn Trent Water & Hafren Dyfrdwy Ground Investigation Framework.
The framework, valued at £36 million over a three-year period, brings together 12 contractors to undertake vital ground inv

08/04/2025
When business is booming and demand is on the rise, your warehouse's production capacity can start to feel the strain.
While some companies might consider relocating or expanding their premises, there's a smarter solution that doesn't involve moving out—move up instead.

08/04/2025
Fibre cement is a versatile and robust building material that has gained popularity among the construction industry in recent years due to its strength, durability, and low maintenance qualities.
Fibre cement is made from a mixture of cement, cellulose fibres, sand, and other additives that are co

08/04/2025
Peabody's regeneration of South Thamesmead has reached a major milestone, with a topping out ceremony held to celebrate the latest phase of the transformation.
The event marked the progress of Phase Two of Peabody's seven-phase masterplan, a joint venture with housebuilder Lovell, which will delive

07/04/2025
GRAHAM has secured a partnership contract with Solihull Council for the delivery of hard facilities management (FM) services under the established Property Services and Maintenance Partnership.
The new agreement, awarded after a competitive procurement process, extends a relationship with Solihull

07/04/2025
Fleete has started construction on what is believed to be the largest dedicated commercial vehicle electric charging hub in the UK.
The shared facility, located in the Port of Tilbury, is on track for completion in December 2025.
The project marks the first works funded by the UK Government under