Construction News
30/11/2010
Speedy Cuts Lighting Costs By 95%
Speedy, the UK's leading provider of equipment rental and support services,has secured an exclusive access agreement for a new energy saving 24-watt fluorescent lamp.
The new product can be used as a direct replacement for existing 110v TH 500w lamps and reduces energy costs by 95 per cent.
On average, a site using 100 lights annually could save almost £17,000 by switching to the new lamp, which fits the conventional 500 TH floodlight without modification.
Speedy, which recently announced an investment of £2 million into energy efficient lighting towers, says it is helping its customers stay ahead of possible changes in legislation governing lighting.
In two years time, normal filament light bulbs will no longer be available on the UK market, while halogen lights – which the new 24 watt fluorescent lamp replaces – are predicted to be next as they use around five times as much energy as standard bulbs.
Andy Connor, supply chain director at Speedy, said: "We continually search for pioneering new products like this lamp which can help our customers to reap significant financial and energy savings.
"Cutting carbon and spending less are two of the most important objectives to businesses of any size and new technology will play an increasing role in achieving them as well as operational changes such as minimising waste."
The new product can be used as a direct replacement for existing 110v TH 500w lamps and reduces energy costs by 95 per cent.
On average, a site using 100 lights annually could save almost £17,000 by switching to the new lamp, which fits the conventional 500 TH floodlight without modification.
Speedy, which recently announced an investment of £2 million into energy efficient lighting towers, says it is helping its customers stay ahead of possible changes in legislation governing lighting.
In two years time, normal filament light bulbs will no longer be available on the UK market, while halogen lights – which the new 24 watt fluorescent lamp replaces – are predicted to be next as they use around five times as much energy as standard bulbs.
Andy Connor, supply chain director at Speedy, said: "We continually search for pioneering new products like this lamp which can help our customers to reap significant financial and energy savings.
"Cutting carbon and spending less are two of the most important objectives to businesses of any size and new technology will play an increasing role in achieving them as well as operational changes such as minimising waste."
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i