Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
25/02/2011

Willmott Dixon's UK First With BREEAM Outstanding Health Facility

Willmott Dixon, in partnership with NHS South of Tyne & Wear, has achieved its ambition to build the UK’s first BREEAM ‘outstanding’ health facility.

The company's £17 million Houghton-Le-Spring Primary Care & Leisure Centre scored over 86 per cent in its design stage assessment to achieve the highest sustainable accolade possible for property. The building is due for completion in June, when it will be re-assessed in a BREEAM post-construction review where it is expected to retain the ‘outstanding’ rating.

BREEAM (Building Research Establishment Environmental Assessment Method) is the leading and most widely used environmental assessment method for buildings. It addresses wide-ranging environmental and sustainability issues giving the ability to demonstrate the environmental credentials of buildings.

Factors behind the centre's super ‘green’ rating include renewable energy provided by 12.5 square metres of solar thermal panels to preheat domestic hot water, 350 square metres of photovoltaic panels and an 18m high wind turbine, while ground source heat pumps supply natural heat from the ground to the entire building. This will drastically reduce its carbon emissions and provide much lower running costs, with a targeted EPC rating of 'A'.

-- Advertisement --
hss

Health facilities are traditionally high consumers of fossil fuel energy, so Willmott Dixon wanted to demonstrate how it is possible to create a highly energy efficient community health facility in Houghton-le-Spring in Sunderland.

A further innovation is a Breathing Buildings ventilation system. This utilises a 1m wide 'thermal wall' that runs through the middle of the building which, together with a concrete plenum at its base, provides fresh air at a constant temperature by using its thermal mass. The wall is divided into 49 separate chimneys which feed individual rooms on one side and a large central atrium on the other via low powered fans.

Further features include electric car plug in points in the car park, exporting redundant heat to the neighbouring Sports Centre to ensure no wastage, exposed concrete soffits to provide natural cooling at night, green sedum roof to encourage biodiversity and attenuate rain overflow to reduce the drainage load, as well as rainwater harvesting system. The project will also see 98% of waste diverted from landfill.

Key partners involved with this unique project include P+HS, architects, Mott MacDonald, M&E engineers, LJJ, building services contractor, Southern Green, landscape architect, Cundall Johnston, structural engineer and Breathing Buildings for the innovative ventilation system.

(CD/GK)



Latest Construction News

20/11/2024

Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024

The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024

Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024

Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024

Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024

Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024

Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024

West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...
19/11/2024

McLaren Construction has commenced works at the first UK industrial scheme in the East Midlands for a joint venture with Garbe Industrial Real Estate GmbH and Invesco Real Estate. McLaren will oversee all aspects of construction for the £30 million project located in Shireoaks, Worksop - in the ...
19/11/2024

Pennyfarthing Homes has submitted a planning application for 74 new homes in Fordingbridge as part of its plans to build a neighbourhood of 342 homes on the northern edge of the Hampshire market town. The new development which is part of the wider scheme known as Forde Valley and follows ...
Stuart CanvasBRICOFLOR UKAqua Direct LtdLakeside HireEfco UK LtdThink Construction Skills Ltd.T & D Glazing And Installation LimitedFPS Air Compressors LtdSpeedy Street Solutions LtdRhino Steel Cladding Limited
Terms and Conditions
2024/11/21 10:51:37