Construction News
01/04/2011
Alumasc's Cast Iron Museum Solution
An Apex Heritage Cast Iron Rainwater System from Alumasc has been used to re-create a 1920’s period appearance at Imperial War Museum London.
During the refurbishment of the iconic main museum building, Alumasc's Apex Cast Iron downpipes and hopper heads were specified for their compliance with English Heritage Guidelines and for the design versatility they present.
Apex cast iron systems are available from stock or can be made-to-order to match existing installations or create new designs. At Imperial War Museum London, a made-to-order range was fabricated by Alumasc to replicate the original system, including bespoke date-embossed hoppers to match the existing units. Throughout the project Alumasc worked with the installer, Salmon Plumbing, and architects Faithful and Gould on the design solution and flow calculations for the project.
The Apex Heritage Cast Iron product range comprises traditional gutter profiles, round and square pipes, and all associated fittings and accessories. It is produced using an authentic sand casting method that combines traditional manufacture with modern quality control and standards. Cast iron gutters and downpipes are extremely strong, durable and vandal resistant, with minimal maintenance requirements and a life expectancy in excess of 40 years. Apex systems are supplied factory primed or in a three-coat satin black pre-finish and fully comply with BS 460: 2002 Cast Iron Rainwater Goods.
Aqualine Aluminium guttering was also specified for an additional roof area that did not require replication of the existing system. Aqualine is suitable for both refurbishment and new build projects, offering concealed site fixing and jointing for a clean external appearance and high flow capacity for enhanced performance.
In accordance with Alumasc's commitment to sustainable building products and practices, Cast Iron and Aluminium are 100% recyclable.
During the refurbishment of the iconic main museum building, Alumasc's Apex Cast Iron downpipes and hopper heads were specified for their compliance with English Heritage Guidelines and for the design versatility they present.
Apex cast iron systems are available from stock or can be made-to-order to match existing installations or create new designs. At Imperial War Museum London, a made-to-order range was fabricated by Alumasc to replicate the original system, including bespoke date-embossed hoppers to match the existing units. Throughout the project Alumasc worked with the installer, Salmon Plumbing, and architects Faithful and Gould on the design solution and flow calculations for the project.
The Apex Heritage Cast Iron product range comprises traditional gutter profiles, round and square pipes, and all associated fittings and accessories. It is produced using an authentic sand casting method that combines traditional manufacture with modern quality control and standards. Cast iron gutters and downpipes are extremely strong, durable and vandal resistant, with minimal maintenance requirements and a life expectancy in excess of 40 years. Apex systems are supplied factory primed or in a three-coat satin black pre-finish and fully comply with BS 460: 2002 Cast Iron Rainwater Goods.
Aqualine Aluminium guttering was also specified for an additional roof area that did not require replication of the existing system. Aqualine is suitable for both refurbishment and new build projects, offering concealed site fixing and jointing for a clean external appearance and high flow capacity for enhanced performance.
In accordance with Alumasc's commitment to sustainable building products and practices, Cast Iron and Aluminium are 100% recyclable.
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i