The tallest building in Reading is enjoying substantial energy savings thanks to the installation of Tyco Thermal Controls HWAT single pipe hot water temperature maintenance system.
Rising 128m above the Reading skyline, The Blade has a distinctive spire that dominates the upper part of the building, and stands on a site on the eastern edge of Reading’s commercial centre. This iconic building provides cutting edge headquarters accommodation and boasts over 10,000m² of office space over 14 floors.
In order to meet the requirements of the building regulations and seek opportunities to reduce energy for this flagship development, NG Bailey opted for Raychem's HWAT M self-regulating cable and the HWAT-ECO control system as an alternative to a conventional recirculation system for the domestic hot water.
Installed by Woking based, Jointing Technologies in every washroom area on each floor of the building, the Raychem hot water temperature maintenance system offers an intelligent way to supply hot water which does not require return pipes, valves or pumps.
The system works by attaching a self-regulating heating cable to the single hot water pipe which keeps the water at the desired temperature. Because the temperature of the cable adjusts at any point along the pipe depending on the local conditions of the pipe network, the individual pipe is heated everywhere and the temperature can be selected up to that of the storage tank temperature.
Generating energy savings of up to 50%, the intelligence of the system resides in the self-regulating cables and the Raychem HWAT-ECO control unit which limits the heat output of the cables according to the specific requirements of the building.
The HWAT-ECO combines the clock time functions with the monitoring of the boiler temperature in order to ensure that the system is used solely for temperature maintenance, thus avoiding superfluous heat production and minimising energy consumption. In addition, the ability to link the system to the Building Management System (BMS) of The Blade, contributed to the overall BREEAM rating of Very Good.
Jonathan Jones from Tyco Thermal Controls commented: "Under the strict requirements of the Building Regulations, new developments are required to reduce energy usage for heating and cooling which means that the energy needed for sanitary warm water production now takes up a bigger portion of the energy needs of a building.
"The installation of the HWAT self-regulating cable and the HWAT-ECO intelligent control system, means that the building can operate far more efficiently than with a conventional recirculation system and greater savings can be achieved than with traditional control equipment and timers."
(CD/GK)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
21/11/2024
Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024
At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...