Construction News
01/06/2011
Core Scores At EcoBuild
Core Structures has started work on the first contract secured as a result of exhibiting at EcoBuild in London in March.
The work, worth £ 50,000, is for a porter’s lodge at a school within sight of historic York Minster.
The company, designs, supplies and installs fully integrated building solutions using glulam engineered structures and advanced floor, wall and roof panel systems. These are becoming increasingly sought after for public buildings, churches, leisure centres, health centres, supermarkets and even in some special domestic situations.
Ecobuild is the world’s biggest event for sustainable design, construction and the built environment and the UK’s largest construction event of any kind and Core Structures was the only company from the North-east to take part in it.
“As a result we’ve had enquiries from the Isle of Wight to the Isle of Lewis,” said director Hamish Morrison, “We’ll be following up on those for a while but it was good to get the first project started even if getting supplies to the site down the narrow York streets is a bit of a challenge.”
Core Structures designed and installed their own stand, constructed from glulam which attracted a lot of interested and which they could have sold several times over. They were also contracted to build the neighbouring Extreme Timber stand for Pasquill Timber Engineering, part of the Saint-Gobain group, a world leader in the design, production and distribution of materials for the construction market.
“That stand also attracted a lot of attention. The Saint-Gobain Group is part of the sourcing team for the Olympics so it’s possible the stand could end up in the Olympic village,” said Hamish. “There’s a lot of new interest in glulam and what it can be used to build.”
Now in its second year of trading and on track to double last year’s £600,000-worth of business, Core Structures has moved its HQ to a suite at Gordon House, Greenbank Road, Aberdeen and increased its staff to five with the appointment of Stephen Keegan, an estimator/surveyor with more than 20 years professional experience.
Nearer to home, Core Structures recently completed work on a new church in Banchory and is working on a conference centre, also in Banchory, as well as some very special private houses in the Highlands.
(GK/KMcA)
The work, worth £ 50,000, is for a porter’s lodge at a school within sight of historic York Minster.
The company, designs, supplies and installs fully integrated building solutions using glulam engineered structures and advanced floor, wall and roof panel systems. These are becoming increasingly sought after for public buildings, churches, leisure centres, health centres, supermarkets and even in some special domestic situations.
Ecobuild is the world’s biggest event for sustainable design, construction and the built environment and the UK’s largest construction event of any kind and Core Structures was the only company from the North-east to take part in it.
“As a result we’ve had enquiries from the Isle of Wight to the Isle of Lewis,” said director Hamish Morrison, “We’ll be following up on those for a while but it was good to get the first project started even if getting supplies to the site down the narrow York streets is a bit of a challenge.”
Core Structures designed and installed their own stand, constructed from glulam which attracted a lot of interested and which they could have sold several times over. They were also contracted to build the neighbouring Extreme Timber stand for Pasquill Timber Engineering, part of the Saint-Gobain group, a world leader in the design, production and distribution of materials for the construction market.
“That stand also attracted a lot of attention. The Saint-Gobain Group is part of the sourcing team for the Olympics so it’s possible the stand could end up in the Olympic village,” said Hamish. “There’s a lot of new interest in glulam and what it can be used to build.”
Now in its second year of trading and on track to double last year’s £600,000-worth of business, Core Structures has moved its HQ to a suite at Gordon House, Greenbank Road, Aberdeen and increased its staff to five with the appointment of Stephen Keegan, an estimator/surveyor with more than 20 years professional experience.
Nearer to home, Core Structures recently completed work on a new church in Banchory and is working on a conference centre, also in Banchory, as well as some very special private houses in the Highlands.
(GK/KMcA)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i