Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,263 companies....

Construction News

12/09/2011

Alpha Plus Appoints BAM To Extend Hilden Grange School

The new split level ultra modern three-storey extension to the preparatory school at Hilden Grange in Tonbridge will be built by BAM Construction.

The contractor was chosen for the £4 million design and build contract by the Alpha Plus Group, which is investing heavily in this premier prep school in order to meet the current expectations of future pupils and offer much improved facilities replacing old temporary buildings.

BAM will construct a three-storey school building in the form of two wings located at the back of the existing school, set into a north facing sloping site. The building will feature a cross-laminated timber frame, larch boarding and cedar-clad walling. The east wing extension has a 'green roof' area softening the building into its setting using native planting. The contract includes external works such as play areas and creating a multi-use games pitch.
-- Advertisement --
hss



BAM has appointed Daniel Brenchley as project manager, and it has just commenced the construction phase of the project and will complete works in time for the 2012/13 school year.

Mr Brenchley said: "The school is designed with learning and play in mind for the various tiered age groups and uses natural materials to keep in touch with its surroundings. The building is very environmentally friendly being mostly timber construction and from sustainable sources.

"We are delivering this project in a live school environment on a very tight site and we have paid attention to this critical element of the project by routing the students away from the construction activities."

Richard Jones, Property Director of Alpha Plus Group, said: "This is an innovative building that will transform the school. The new building will provide a spacious, modern teaching space befitting the high quality education received by Hilden Grange pupils.

"The project consists of a playground, new teaching spaces for nursery and reception and years 1-5. The new facilities include science labs, an art and design area, a library, a learning support area and a dining hall. The existing school hall will be retained as a dedicated sports facility. The temporary classrooms will be replaced by the new buildings. The layout of the main school building – the large Victorian House – will alter internally to provide further classroom space, but there will be no external changes."

(CD/GK)

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
BRICOFLOR UKStuart CanvasEfco UK LtdLakeside HireThink Construction Skills Ltd.Aqua Direct LtdT & D Glazing And Installation LimitedUrban SquareuBidSJH