Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,036 companies....

Construction News

18/11/2011

Massive Steel Beam Takes Centre Stage

The biggest support act for the Leeds Arena has arrived and it's not a rock band but a 180 tonne, 45 meter long proscenium steel beam which will take pride of place supporting the main stage.

The beam is the heaviest piece of steel in the entire arena building, providing stability to a complex steel structure involving 3,500 tonnes of steel, which would stretch for 24 miles from Leeds to York if laid out flat.

It will take two cranes each weighing 500 tonnes to lift it into place. Once it is lifted 12 people will work throughout the night and for around 36 consecutive hours to hoist it into place.

Fixing the proscenium beam is an important milestone in BAM's construction of the £60m Leeds Arena project as it signifies that work to build the 13,500 capacity concert and events venue continues apace and to programme in time for the opening in 2013.
-- Advertisement --
hss



A peek at the city centre site's public viewing platform at Clay Pit Lane reveals a hive of activity. The foundations and two main staircases are now in place along with a lift shaft and two concrete core structures, together offering an exciting glimpse of what the building will look like when complete.

At any one time up to now, 75 men and women are working on the site, school visits are a frequent occurrence and opportunities are now becoming available for local people to benefit from apprenticeships and job opportunities at the site.

Gordon Alexander, BAM's Construction Manager for the Leeds Arena, said: "The proscenium beam is a crucial part of the whole structure of the Leeds Arena and an important milestone in the scheme as this is when the building really starts to take shape. Once in place it will create the archway for the stage and support the entire roof structure.

"Getting the beam in place at this stage is also an indication that construction is progressing as planned and to programme which is great news."

The Leeds Arena will be a unique theatre style venue with all seats facing the performance area each with perfect sight-lines. Spectators will be much closer to the stage than other traditional bowl venues. The external design is a stunning honeycomb design of lights that can change colour to reflect the mood of the arena event at the time.

(CD)

Latest Construction News

11/04/2025
Demolition work has commenced at Darwen Youth Centre as part of a multi-million-pound redevelopment that will significantly expand and enhance the facility. Bolton-based contractor Seddon is delivering the project, which will see the centre on Gary Aspden Way double in size, adding a new first floo
11/04/2025
Salford City Council has approved plans for a state-of-the-art Acoustics building, set to become a key part of Crescent Salford's innovation zone. The world-class facility will serve as the new home for the University of Salford's Acoustics Department, supporting research, commercial activities an
11/04/2025
Travelodge has opened the doors to a new 113-room hotel in Chiswick, West London. Situated adjacent to Chiswick Roundabout, the new hotel has created 20 new jobs for the local community. London Chiswick Travelodge is ideally located for both business and leisure travellers. Situated just a short di
11/04/2025
Salford City Council has approved plans to create a network of riverside walking and cycling routes connecting Salford Quays to the city centre, transforming an 8km stretch of the River Irwell into a vibrant and accessible urban park. The plans, which were shaped by a public consultation held at th
11/04/2025
Avant Homes has unveiled plans to transform the 49-acre former Burtons clothing factory site in Burmantofts, Leeds, into a new sustainable community. The development, named Montague Place in honour of Sir Montague Burton, the founder of the Burtons factory in 1921, is set to breathe new life into
11/04/2025
Proteus Waterproofing has appointed Tom Rae as its new Marketing Manager. He brings a wealth of experience in strategic marketing, brand development and business growth, and will play a key role in strengthening the company’s presence in the waterproofing industry. With more than 15 years of mark
10/04/2025
Network Rail has appointed Skanska to undertake the replacement of the Clifton Bridge near Penrith, Cumbria. The £43 million contract involves designing, constructing, and installing a new 130-metre single-span steel bridge to replace the existing structure that carries the West Coast Main Line ov
10/04/2025
Mace has been appointed by JP Morgan Asset Management to redevelop 65 Gresham Street, one of the largest building reuse projects in the City of London. The project will transform the existing structure into over 36,800 square metres of Grade A office, retail and ancillary spaces.​ Emphasisi
10/04/2025
Bristol City Council has announced the closure of Bathurst Swing Bridge for a comprehensive refurbishment, a project expected to last up to two years. The iconic bridge, constructed in 1905, connects Wapping Road and Cumberland Road to Commercial Road in the Harbourside area. Originally designed to
10/04/2025
​QuikSTATS, a subsidiary of Kier Group, has secured a contract with National Highways to provide underground utilities mapping services across England's strategic road network. The contract, valued at up to £9 million, spans three years with an option for a one-year extension. This agreement
BRICOFLOR UKStuart CanvasLakeside HireT & D Glazing And Installation LimitedAqua Direct LtdEfco UK LtdAmrin Resources LtdGroundwater Monitoring & Drilling LimitedAsk EngravingIron Works UK Ltd