Construction News
24/11/2011
Morgan Sindall Completes Gatwick Extension
The new look North Terminal at Gatwick Airport has been opened by former Prime Minister Sir John Major KG CH, marking the successful completion of the 18-month project delivered by Morgan Sindall.
The North terminal has been extended to accommodate 20 million passengers per year by 2020.
The £73 million scheme is part of a £1.2 billion upgrade of Gatwick Airport. It features extension of the southern and eastern zones of the terminal to provide additional check-in and baggage reclaim capacity.
There are now 18 new check-in desks, bringing the total to 144, including 77 self-service kiosks. The four new reclaim belts - three for international flights and one for domestic - will significantly cut time spent waiting for luggage.
Stewart Wingate, Gatwick Airport Chief Executive said: "It's fair to say that passengers flying out of the North Terminal used to be greeted with a dated 80s feel with little aesthetic appeal and confusing way finding. But that was the Gatwick of yesteryear. Today, the layout and design of the upgraded forecourt, interchange facilities and the expanded terminal building provide a much more positive first impression.
"This is all part of our investment programme, which has a focus on improving the overall passenger experience of our airport, from the moment they arrive at the front door, check-in, pass through security to when they board their flight. We want passengers to spend as little time in queues or waiting for luggage as is possible, and we want them to enjoy their surroundings before they jet off for their holidays. That has been the focus of our work at the airport so far and there is still much more to come."
In July 2011 Morgan Sindall won a place on the construction framework that will implement the next wave of improvements at Gatwick that follow on from the North Terminal extension. This £1.2 billion programme of upgrades includes a broad range of major projects including new aircraft piers.
Morgan Sindall is competing with nine other contractors for the individual schemes over the four-year lifespan of the framework.
(CD)
The North terminal has been extended to accommodate 20 million passengers per year by 2020.
The £73 million scheme is part of a £1.2 billion upgrade of Gatwick Airport. It features extension of the southern and eastern zones of the terminal to provide additional check-in and baggage reclaim capacity.
There are now 18 new check-in desks, bringing the total to 144, including 77 self-service kiosks. The four new reclaim belts - three for international flights and one for domestic - will significantly cut time spent waiting for luggage.
Stewart Wingate, Gatwick Airport Chief Executive said: "It's fair to say that passengers flying out of the North Terminal used to be greeted with a dated 80s feel with little aesthetic appeal and confusing way finding. But that was the Gatwick of yesteryear. Today, the layout and design of the upgraded forecourt, interchange facilities and the expanded terminal building provide a much more positive first impression.
"This is all part of our investment programme, which has a focus on improving the overall passenger experience of our airport, from the moment they arrive at the front door, check-in, pass through security to when they board their flight. We want passengers to spend as little time in queues or waiting for luggage as is possible, and we want them to enjoy their surroundings before they jet off for their holidays. That has been the focus of our work at the airport so far and there is still much more to come."
In July 2011 Morgan Sindall won a place on the construction framework that will implement the next wave of improvements at Gatwick that follow on from the North Terminal extension. This £1.2 billion programme of upgrades includes a broad range of major projects including new aircraft piers.
Morgan Sindall is competing with nine other contractors for the individual schemes over the four-year lifespan of the framework.
(CD)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a