Construction News
23/12/2011
Foster + Partners To Design Ourense AVE Station
Foster + Partners, in a joint venture with engineers, G.O.C. and Cabanelas Castelo Architects, has won an international competition to design a new high-speed rail station in the city of Ourense in Galicia, north western Spain.
The design combines transport infrastructure with a new park, which will create a major new public space in the city and open up pedestrian links between the districts on each side of the tracks.
The high-speed AVE train station is located over the existing track level and integrates a bus station and parking area below. Above ground, the station's presence is discreet and transparent, with glazed facades that allow views through to the mountains beyond. The concourse is sheltered beneath a sequence of lightweight roof canopies, which rise in a sweeping arc over the station and extend to shade the plaza and entrance to the park. The underside of the roof is reflective to bounce daylight down to the platforms, and between each canopy is a glazed, linear opening.
The park extends from the station plaza and is intersected by pools of water and a formal network of pedestrian walkways, which echo the alignment of the tracks and connect the streets of Barrio del Puente to Barrio Veintiuno.
(CD/GK)
The design combines transport infrastructure with a new park, which will create a major new public space in the city and open up pedestrian links between the districts on each side of the tracks.
The high-speed AVE train station is located over the existing track level and integrates a bus station and parking area below. Above ground, the station's presence is discreet and transparent, with glazed facades that allow views through to the mountains beyond. The concourse is sheltered beneath a sequence of lightweight roof canopies, which rise in a sweeping arc over the station and extend to shade the plaza and entrance to the park. The underside of the roof is reflective to bounce daylight down to the platforms, and between each canopy is a glazed, linear opening.
The park extends from the station plaza and is intersected by pools of water and a formal network of pedestrian walkways, which echo the alignment of the tracks and connect the streets of Barrio del Puente to Barrio Veintiuno.
(CD/GK)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i