Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

09/01/2012

Work Starts To Strengthen Hammersmith Flyover

Construction News Image
The Mayor of London, Boris Johnson, visited the A4 Hammersmith flyover today to inspect work being carried out to repair one of the most vital stretches of road in the capital as soon as possible.

The complex flyover was forced to close due to water damage that has corroded and weakened the cables that give the bridge its strength.

It had been thought that it would be up to ten years before any major work was required on the flyover, however recent maintenance checks showed work would be required much earlier than anticipated.
-- Advertisement --
hss



A detailed investigation was launched immediately and a team of 80 Transport for London (TfL) engineers, contractors, and leading structural engineering experts have been working nonstop on site and within the structure throughout the Christmas and New Year period.

The engineers have inserted cameras into the structure of the flyover at 100 different locations to assess key sections of the cables it contains.

They told the Mayor that investigations of the extent of the damage to those cables must continue for a further week before engineers will be in a position to decide whether it is strong enough to allow its reopening even to light traffic.

However they confirmed that preparatory work can begin ahead of the installation of new cables within the structure that will strengthen the flyover and allow it to take full vehicle loading again.

They also confirmed that the flyover will be repaired and fully available to traffic before the London 2012 Games.

(CD/GK)

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Aqua Direct LtdT & D Glazing And Installation LimitedEfco UK LtdThink Construction Skills Ltd.Stuart CanvasBRICOFLOR UKLakeside HireBRICOFLOR Sustainable FlooringAbacus Garage Door Solutions LtdSerene Stone