Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

21/02/2012

Go Geothermal Predicts Rise In PE100-RC Pipework Installations

Construction News Image
An increasing number of drilling contractors are successfully exploiting the technical benefits now available from offering PE100-RC probes and pipework rather than traditional PE100 in their ground source installations.

Sean Sowden of Go Geothermal, the UK's leading independent geothermal pipe and material supplier, says that it has seen demand for the new generation of ground source probes and pipework increase considerably since it was included as an acceptable pipe material in the GSHPA’s Vertical Borehole Standards, published in September 2011.

He says: "PE100-RC gives contractors an important differentiator in a competitive market and offers real technical and commercial advantages for both probes and collector pipes."

PE100-RC stands for Polyethylene Resistant to Crack and it is defined as an advanced non-cross linked polyethylene, characterised by longer lateral chains than those found in standard PE100.

What this means is that PE100-RC has the same properties as PE100 in terms of temperature resistance and the requirement for welded connections but crucially it offers better mechanical properties with increased resistance to both stress cracking and point loads.
-- Advertisement --
hss



The PE100-RC pipework supplied by Go Geothermal is RAUGEO PE100-RC, developed by the polymer specialists REHAU and already used extensively in many parts of mainland Europe where PE100-RC is the ground source probe and pipework of choice.

With many European heat pump manufacturers now specifying only PE100-RC for use with their heat pumps, Go Geothermal predicts that the market for the pipework is set to expand even further.

The major benefit of PE100-RC for probes is the increased point load resistance over PE100. When a probe is inserted into a borehole, it does not always sit straight but instead rests against the borehole wall. If there are any “sharps” the pipe will expand and contract against this sharp and, over time, this ‘point load’ could eventually cause pipe failure in PE100 probes.

In both Notch Tests and Full Notch Creep Tests (FNC) measuring stress cracking and point loads for both types of pipework, PE-RC has been shown to outperform PE100. For example, PE100 achieves >1,000 hours in the Notch test and >2,000 in the FNC test, whereas PE-RC achieves >5,000 hours in both.

Both REHAU and Go Geothermal have also proved that the increased mechanical properties of PE100-RC pipe mean that it can be used in horizontal installations without the requirement of a sand bed. This saves a significant amount in installation time and material costs (sand).

In many instances, it actually works out more competitive to use PE100-RC pipe for horizontal collectors as the additional cost of the pipe is more than offset by the savings on the overall installed cost.

PE100-RC pipework is also used on the REHAU RAUGEO coaxial probe used for Geothermal Radial Drilling (GRD), providing optimum probe strength when the coaxial probe is inserted into the borehole and can easily be connected into the REHAU manifold chamber range via Electrofusion fittings.

Further details are available via the website at www.gogeothermal.co.uk, or by calling 01388 720228.

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
T & D Glazing And Installation LimitedLakeside HireAqua Direct LtdBRICOFLOR UKThink Construction Skills Ltd.Stuart CanvasEfco UK LtdEfco UK LtdGrey Slate and StoneChess Environmental Ltd