Construction News
07/06/2012
Kalzip Supplies Stainless Steel Shelter
The Chernobyl catastrophe in the night of April 26, 1986 has been carved into our collective memory and has revealed world-wide the danger accompanying the civil use of nuclear power.
The end of April sees the 26th anniversary of the reactor incident. The large-scale radioactively contaminated region around the reactor is uninhabitable and is still a prohibited military area.
The construction work for a new airtight protective covering, designed for a period of 100 years, has recently begun. It is intended to stretch over the destroyed reactor block and the old concrete sarcophagus in an arched shape. Kalzip is directly participating in the construction of the Chernobyl project. The internationally active manufacturer of metal building envelopes was awarded the contract for the construction elements for the stainless steel interior and exterior envelope at the end of March. Delivery of the materials and machines for the on-site production has already begun. A 29,000 ton metal construction with a height of 105 m, a length of 150 m and a span of 257 m is planned, which is to be completed by 2015.
"The convincing test results of the special solution, which was specially developed for this particular purpose on the basis of our proven standing seam system were decisive for the award of the contract," said Managing Director Jörg Schwall. "The high demand on stability against wind suction forces of tornado class 3 was a particular challenge for our engineers."
In 2007, Ukraine awarded the contract for the new shelter to Novarka. Novarka is a French consortiumconsisting of the companies Vinci and Bouygues, which was founded solely for the construction of this shelter. The aim of the internationally funded project is to transform the Chernobyl site into an ecologically safe state.
The project will be financed by various donor countries; the main part of the building costs of the Chernobyl Shelter Fund (CSF) will be borne by the G8 states and the EU. Ukraine itself will also make a substantial contribution.
For further information please contact us at enquiries.uk@kalzip.com
The end of April sees the 26th anniversary of the reactor incident. The large-scale radioactively contaminated region around the reactor is uninhabitable and is still a prohibited military area.
The construction work for a new airtight protective covering, designed for a period of 100 years, has recently begun. It is intended to stretch over the destroyed reactor block and the old concrete sarcophagus in an arched shape. Kalzip is directly participating in the construction of the Chernobyl project. The internationally active manufacturer of metal building envelopes was awarded the contract for the construction elements for the stainless steel interior and exterior envelope at the end of March. Delivery of the materials and machines for the on-site production has already begun. A 29,000 ton metal construction with a height of 105 m, a length of 150 m and a span of 257 m is planned, which is to be completed by 2015.
"The convincing test results of the special solution, which was specially developed for this particular purpose on the basis of our proven standing seam system were decisive for the award of the contract," said Managing Director Jörg Schwall. "The high demand on stability against wind suction forces of tornado class 3 was a particular challenge for our engineers."
In 2007, Ukraine awarded the contract for the new shelter to Novarka. Novarka is a French consortiumconsisting of the companies Vinci and Bouygues, which was founded solely for the construction of this shelter. The aim of the internationally funded project is to transform the Chernobyl site into an ecologically safe state.
The project will be financed by various donor countries; the main part of the building costs of the Chernobyl Shelter Fund (CSF) will be borne by the G8 states and the EU. Ukraine itself will also make a substantial contribution.
For further information please contact us at enquiries.uk@kalzip.com
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i