Crossrail and development partner Cardinal Lysander have submitted a joint planning application to the London Borough of Islington and the City of London Corporation for an over-site development above the western entrance of Farringdon Crossrail station.
The 207,000 sq ft development, located at the corner of Cowcross Street and Farringdon Road, will comprise six storeys of high-quality office space, with retail units at street level. The building has been carefully designed to integrate with Crossrail's operating station and will also improve local views of St Paul’s Cathedral.
Ian Lindsay, Crossrail Land and Property Director said: "By 2018 Farringdon will be one of Britain’s busiest rail stations, linking Crossrail, Thameslink and London Underground services. Our proposed developments will accelerate the area’s regeneration, helping Farringdon re-emerge as a destination in its own right."
Charles Pinchbeck of Jones Lang LaSalle, development managers for Cardinal Lysander said: "Cardinal Lysander firmly believes in the future of Farringdon as one of London's premier business districts. The scheme prepared with Crossrail and other stakeholders is well-placed to capture Farringdon's potential."
Farringdon is at the heart of the Crossrail route and will be a key link in bringing passengers directly from within Greater London and beyond to the business hubs in the City and Canary Wharf. Located at the only intersection between Crossrail and Thameslink, Farringdon will directly connect with three of London’s five airports, providing a railway connection between Heathrow and Gatwick. When complete, over 140 trains per hour will flow through the Farringdon interchange.
Farringdon Crossrail station will comprise two platform tunnels, each the length of two football pitches, linking two new ticket halls. The western ticket hall will be shared with Thameslink services, and will have an entrance on Cowcross Street, directly opposite Farringdon Tube station.
The eastern ticket hall will have entrances at the Long Lane end of the station, on Lindsey Street and Hayne Street. It will also link directly with the existing London Underground platforms at Barbican station.
The private sector funded over-site developments will commence during the latter stages of work to construct Farringdon Crossrail station. Crossrail will commence services in 2018.
(CD)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...
19/11/2024
McLaren Construction has commenced works at the first UK industrial scheme in the East Midlands for a joint venture with Garbe Industrial Real Estate GmbH and Invesco Real Estate. McLaren will oversee all aspects of construction for the £30 million project located in Shireoaks, Worksop - in the ...
19/11/2024
Pennyfarthing Homes has submitted a planning application for 74 new homes in Fordingbridge as part of its plans to build a neighbourhood of 342 homes on the northern edge of the Hampshire market town. The new development which is part of the wider scheme known as Forde Valley and follows ...