Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

23/08/2013

Balfour Beatty To Build Emergency Dept

Construction News Image
Balfour Beatty has been awarded a £14.4 million contract by the North West London Hospitals NHS Trust to construct a new Emergency Department at Northwick Park Hospital in Harrow.

The pavilion style building will provide users with a new walk-in entrance, waiting area, and external drop off area; all with direct and level access to the car park.

Enclosed link bridges will connect the new building to other parts of the hospital including acute admissions, paediatrics, the Intensive Treatment Unit and operating theatres. A lower level will provide accommodation such as offices, seminar rooms and the main plant room.

Balfour Beatty Engineering Services will deliver the M&E services installation package including modular services units, which are constructed off site, and help to provide high quality, pre-tested services. The modular construction method also helps to reduce installation times and improves safety over in-situ installation methods.
-- Advertisement --
hss



The scheme will be constructed utilising Balfour Beatty’s latest Building Information Modelling techniques which enable stakeholders to view the building from a user perspective and in multidimensional detail before the build, and also help to minimise construction time and costs.

The scheme will be a centre of excellence for urgent and emergency care, supporting the Trust’s vision to improve treatment times and the experience of emergency department users. It will also support effective staff training and is designed to equip the department to respond effectively to existing and future changes in demand.

The building has been designed to be highly sustainable and features such as a roof top bio-diversity garden containing sedum plants and wildflowers will help the building fit into the natural ecology of the area as well as providing pleasant views for the occupants of other buildings. Other sustainability features include an array of power providing photo-voltaic cells, an efficient combined heat and power unit, as well as LED lighting.

Works are scheduled for completion in April 2014.

(CD)

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Efco UK LtdBRICOFLOR UKAqua Direct LtdStuart CanvasLakeside HireT & D Glazing And Installation LimitedThink Construction Skills Ltd.Victory Windows International LtdMacs Truck SalesApollo Scaffolding Ties Ltd