Construction News
16/09/2013
Planning Approved For Farringdon Station
![Construction News Image](https://www.construction.co.uk/newsimages/2_169047_Farringdon.jpg)
Crossrail and development partner Cardinal Lysander have received planning approval from the London Borough of Islington for an over-site development above the western entrance of Farringdon Crossrail station.
The 207,000 sq ft development, located at the corner of Cowcross Street and Farringdon Road, will comprise sixstoreys of high-quality office space, with retail units at street level. The building has been carefully designed to integrate with Crossrail's operating station and will also improve local views of St Paul's Cathedral.
Ian Lindsay, Crossrail Land and Property Director said: "By 2018 Farringdon will be one of Britain's busiest rail stations, connecting Crossrail, Thameslink and London Underground services. The developments will accelerate the area's regeneration, helping Farringdon re-emerge as a destination in its own right."
Farringdon is at the heart of the Crossrail route and will be a key link in bringing passengers directly from within Greater London and beyond to the business hubs in the City and Canary Wharf. When complete, over 140 trains per hour will flow through the Farringdon interchange.
Farringdon Crossrail station will comprise two platform tunnels, each the length of two football pitches, linking two new ticket halls, and will be fully accessible from street to train.
The western ticket, hall shared with Thameslink services, will have an entrance on Cowcross Street, directly opposite Farringdon Tube station. The eastern ticket hall will have entrances at the Long Lane end of the station, on Lindsey Street and Hayne Street. It will also link directly with the existing London Underground platforms at Barbican station.
The Cowcross Street scheme is one of two over-station developments planned in the Farringdon area. In June, Crossrail submitted plans for a significant new commercial development at Lindsey Street to sit above the new Crossrail station eastern ticket hall, opposite the historic Smithfield Market.
The over-site developments are scheduled to commence during the latter stages of work to construct Farringdon Crossrail station. Crossrail will commence services in 2018.
(CD)
The 207,000 sq ft development, located at the corner of Cowcross Street and Farringdon Road, will comprise sixstoreys of high-quality office space, with retail units at street level. The building has been carefully designed to integrate with Crossrail's operating station and will also improve local views of St Paul's Cathedral.
Ian Lindsay, Crossrail Land and Property Director said: "By 2018 Farringdon will be one of Britain's busiest rail stations, connecting Crossrail, Thameslink and London Underground services. The developments will accelerate the area's regeneration, helping Farringdon re-emerge as a destination in its own right."
Farringdon is at the heart of the Crossrail route and will be a key link in bringing passengers directly from within Greater London and beyond to the business hubs in the City and Canary Wharf. When complete, over 140 trains per hour will flow through the Farringdon interchange.
Farringdon Crossrail station will comprise two platform tunnels, each the length of two football pitches, linking two new ticket halls, and will be fully accessible from street to train.
The western ticket, hall shared with Thameslink services, will have an entrance on Cowcross Street, directly opposite Farringdon Tube station. The eastern ticket hall will have entrances at the Long Lane end of the station, on Lindsey Street and Hayne Street. It will also link directly with the existing London Underground platforms at Barbican station.
The Cowcross Street scheme is one of two over-station developments planned in the Farringdon area. In June, Crossrail submitted plans for a significant new commercial development at Lindsey Street to sit above the new Crossrail station eastern ticket hall, opposite the historic Smithfield Market.
The over-site developments are scheduled to commence during the latter stages of work to construct Farringdon Crossrail station. Crossrail will commence services in 2018.
(CD)
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a