JCB is unveiling a new compact model at Conepxo 2014 to add to its growing Hi-Viz Loadall range for construction. The launch of the 525-60 brings full-size telehandler performance and features to the compact sector.
With a maximum lift height of 6m and a load capacity of 2.5 tonnes, the 525-60 is just 1.8m wide and 1.91m tall, allowing access to multi-storey car parks and permitting operation in confined site conditions. The 525-60 Hi-Viz replaces the 524-50, 527-55 and the 520-50 rear-engined models, with a modern side-engine mount design. This permits a low boom pivot point for maximum stability and increased visibility to the rear and across the boom.
Powered by a new Tier 4 Final, 2.5-litre, JCB Diesel by Kohler four-cylinder engine, the 525-60 delivers 55kW (74hp) for easy lifting performance and rapid travel. As with other JCB engines, there is no requirement for a diesel particulate filter or an SCR system to meet the Tier 4 Final emissions regulations. This means that the JCB machine has a service-free emissions control system, reducing operating costs and complexity for customers.
A simple to operate two-stage hydrostatic transmission offers travel speeds of up to 25km/h and the short wheelbase makes the 525-60 an extremely manoeuvrable machine. Equipped with an 80 litre/min hydraulic pump, the machine delivers auxiliary hydraulic power for a sideshift attachment carriage. Customers can choose between JCB’s Q-fit carriage or a skid steer compatible attachment interface for ultimate versatility and fleet acceptance.
All boom functions are controlled by a single servo lever joystick, with proportional control of the two-stage boom extension allowing smooth operation and fine control for the operator. The machine is available with a choice of canopy or fully glazed cab, with the option of air conditioning.
Serviceability is much improved with the side-mounted engine installation and, depending on territory, the machine can be supplied with JCB’s LiveLink telematic monitoring system for maximum fleet visibility and maintenance control. Options include full road light kits and screen guards for harsh working environments.
(CD/IT)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
03/12/2024
Birmingham Children's Hospital has celebrated a significant milestone in the construction of its new clinical building on Loveday Street with a topping-out ceremony. The event marked the completion of the building's steelwork framework. Attendees, including hospital staff, construction partners, ...
03/12/2024
A £6.8 million state-of-the-art Sherwood Observatory Planetarium & Science Centre in Sutton-in-Ashfield has opened its doors to the public. The project, delivered by G F Tomlinson through SCAPE, involved the transformation of a disused Victorian reservoir into a modern visitor attraction and ...
03/12/2024
Last Friday saw the National Access and Scaffolding Confederation (NASC) bring the scaffolding industry together at the ICC Belfast, to celebrate its high achievers. The Scaffolding Excellence Awards 2024 marked the culmination of the industry's first major conference and expo in Europe, Scaffex24, ...
03/12/2024
Barratt London and Places for London have exchanged contracts on a new development site in High Barnet. This is the second project unlocked by the West London Partnership, a collaboration established in June 2024 to deliver over 4,000 new homes across West London. The High Barnet development will ...
03/12/2024
Bellway Strategic Land has submitted a planning application to Durham County Council for a 149-home extension to the Seaham Garden Village development. The proposed development includes open space and wildlife improvements. Bellway conducted a public consultation process over the summer to gather ...
03/12/2024
The Chartered Institute of Building (CIOB) is set to launch its third global survey to investigate the mental health challenges faced by construction workers. The previous study, published in 2020, revealed alarming statistics, including: • 97% of construction workers experiencing high levels of ...
02/12/2024
Thames Water has awarded a £400 million framework to support its infrastructure upgrades over the next five years. The water company aims to address the challenges posed by ageing infrastructure and climate change. The framework will provide access to a range of professional services, including ...
02/12/2024
GRAHAM has been awarded a contract to design and build the first phase of the Cardiff Crossrail project. The ambitious project aims to transform Cardiff's transport infrastructure. As part of an early contractor involvement (ECI) deal, GRAHAM will work closely with Cardiff Council and Transport ...
02/12/2024
Watkin Jones has agreed to develop and deliver 295 new homes on behalf of Torus, the largest affordable housing provider in the North West of England, which will be partly funded by Homes England. The new scheme will result in the regeneration of an existing brownfield site, forming part of an ...
02/12/2024
Costain has been selected to provide programme management services to Thames Water as part of a new five-year framework. The contract will support the delivery of upgrades to the water company's infrastructure assets across the region. Thames Water anticipates a significant increase in its capital ...