Construction News
14/01/2014
Balfour Beatty Lifts New Bridge Over The M54 Motorway
Balfour Beatty has lifted a new bridge into place over the M54 motorway as part of a £12 million project to connect a new high-tech business park to the road network and to provide access for the new Jaguar Land Rover plant.
The bridge, which will serve the i54 business park in South Staffordshire, was delivered for Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.
Balfour Beatty raised the bridge to the required height at its site compound adjacent to the motorway and then transported it along the M54 on self-propelled modular transport units so that it could be slotted into position.
The bridge is a composite structure comprising of four 1,550mm weathered steel beams underneath an in-situ concrete deck, which weighs 411 tonnes with a span length of 40.8m. The bridge deck was constructed on site, using beams supplied by Mabey Bridge. Pre-assembly of the beams and deck at Balfour Beatty’s site compound prior to the lift reduced the amount of time the motorway needed to be closed for installation.
Mark Farrah, Balfour Beatty Managing Director for the North and Midlands Division, said: "I'm delighted to have delivered this important milestone for the Midlands Highways Alliance. This was a complex operation and the smooth delivery was the result of meticulous planning by Staffordshire County Council and the Balfour Beatty project team on site."
(CD/MH)
The bridge, which will serve the i54 business park in South Staffordshire, was delivered for Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.
Balfour Beatty raised the bridge to the required height at its site compound adjacent to the motorway and then transported it along the M54 on self-propelled modular transport units so that it could be slotted into position.
The bridge is a composite structure comprising of four 1,550mm weathered steel beams underneath an in-situ concrete deck, which weighs 411 tonnes with a span length of 40.8m. The bridge deck was constructed on site, using beams supplied by Mabey Bridge. Pre-assembly of the beams and deck at Balfour Beatty’s site compound prior to the lift reduced the amount of time the motorway needed to be closed for installation.
Mark Farrah, Balfour Beatty Managing Director for the North and Midlands Division, said: "I'm delighted to have delivered this important milestone for the Midlands Highways Alliance. This was a complex operation and the smooth delivery was the result of meticulous planning by Staffordshire County Council and the Balfour Beatty project team on site."
(CD/MH)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i