Construction News
27/01/2014
BBGE Invests In Advanced Piling Rigs
Balfour Beatty Ground Engineering (BBGE) has invested in one of the most technologically advanced piling rigs in the world so that it can continue to offer a leading large diameter piling service to its customers.
The Bauer BG30 which costs £1.15 million and weighs 106 tonnes is capable of installing piles to a depth of 64 metres and to a maximum diameter of 2.4 metres.
One of the rig's key advantages is its complete electronic instead of hydraulic systems, greatly enhancing the control which can be achieved during delicate operations. Onboard telemetrics can also be monitored remotely on an iPad or similar handheld device, with the detailed data ensuring that piles can be installed with a greater degree of accuracy than before.
The rig adheres to the latest carbon emissions targets meeting the latest European and UK requirements for vehicles. In addition, a special coating has been applied to key engine parts which help to reduce sound emissions by up to 6dB compared to older models.
Mark Ingram, Balfour Beatty Ground Engineering Operations Director, said: "This new rig allows us to drill bigger and deeper then we have before and is also quieter, quicker and more capable than standard rigs. This investment represents our commitment to ensuring we remain capable of delivering the complex and technically challenging foundations that our customers expect from us."
(CD)
The Bauer BG30 which costs £1.15 million and weighs 106 tonnes is capable of installing piles to a depth of 64 metres and to a maximum diameter of 2.4 metres.
One of the rig's key advantages is its complete electronic instead of hydraulic systems, greatly enhancing the control which can be achieved during delicate operations. Onboard telemetrics can also be monitored remotely on an iPad or similar handheld device, with the detailed data ensuring that piles can be installed with a greater degree of accuracy than before.
The rig adheres to the latest carbon emissions targets meeting the latest European and UK requirements for vehicles. In addition, a special coating has been applied to key engine parts which help to reduce sound emissions by up to 6dB compared to older models.
Mark Ingram, Balfour Beatty Ground Engineering Operations Director, said: "This new rig allows us to drill bigger and deeper then we have before and is also quieter, quicker and more capable than standard rigs. This investment represents our commitment to ensuring we remain capable of delivering the complex and technically challenging foundations that our customers expect from us."
(CD)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i