ISG has been chosen to deliver a development programme for the American School in London.
The contract is worth around £22 million.
Established in 1951 to provide an American education for students of all nationalities in London, the school has been located at its existing site in St John's Wood since 1971. Having undergone numerous enhancements over the past 40 years, the latest developments will see ISG construct a four-storey art block, a subterranean swimming pool and fitness suite and a new playground with external landscaping.
Phase one of the project involves the construction of a 13,000 sq ft art building with a neo-classical style limestone frontal elevation. The rear façade will feature curtain walling to enhance the volume of natural daylight within the structure and brise soleil to minimise solar gain, with a green sedum roof contributing to the design's BREEAM 'Very Good’' performance rating.
ISG will excavate the lower ground floor to the level of the existing school gym basement, with natural light provided by a linear roof light and glazing to the adjoining courtyard. This will accommodate a large ceramics studio with a kiln room, photography studios and toilets. Gallery space will be created on the ground floor, along with a design studio, staff work rooms and stores. First and second floor accommodation will comprise student art studio space.
An external courtyard at lower ground level will link the art building to the new pool and fitness suite that forms the second phase of the redevelopment. The 24,500 sq ft pool and fitness suite complex involves construction of a six lane, 25m swimming pool, a dance studio, fitness suite, changing facilities and ancillary storage, office and plant room areas. ISG will build the new facilities below the existing playground with lighting provided by carefully positioned light voids and roof lights.
Additional work within this phase of the project includes the creation of a new entrance hall in the main school building and the addition of curtain walling to its southern façade, along with recladding the existing external staircases with timber and stone finishes.
The landscaping works in phase three of the programme will see ISG raise the level of the existing playground above the pool and fitness suite by 900mm, with terraced edgings to incorporate the change of level into the existing layout. The work includes both hard and soft landscaping to complement existing mature trees and sports pitches.
(CD/MH)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
21/11/2024
Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024
At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...