Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

07/07/2015

ISG Wins £24m Contract

Construction News Image
ISG has won a £24 million office upgrade and extension contact for 'The Bower' at Stockley Park near Heathrow.

The company will redevelop the existing three-storey property into one of the largest and highly-specified new office development in the Thames Valley region.

The project involves major structural alterations to reconfigure, modernise and extend the eighties era building.

The scheme will create 137,000 sq ft of Grade A, BREEAM 'Excellent' rated office accommodation.

As well as improving the aesthetics, thermal performance and efficiency of the building, ISG will extend the original footprint through the development of two new wings.

These will add 20,000 sq ft of accommodation to the original property, providing the largest single office floor-plate in the Thames Valley.
-- Advertisement --
hss



The programme of works involves the removal of two internal stair cores and the construction of five external staircases.

The existing atrium will be demolished and replaced by a new atrium with a feature staircase and high-specification reception area.

ISG will also reinforce existing columns and introduce additional structural beams to develop open floor plates.

The existing façade will be removed and piled foundations installed to support the new three-storey steel frame extensions to the front of the building.

The façade will be re-instated and feature extensive areas of glazing and high performance cladding.

As part of the scheme, ISG will upgrade and modernise the office's mechanical and electrical infrastructure, installing new highly-efficient building services and roof-mounted photovoltaic cells to generate renewable electricity.

Graeme White, ISG’s divisional director, said: "There has been a surge in demand for property in the Thames Valley from both occupiers and investors over the past year and high-quality office accommodation remains in short supply.

"The result is a surge of activity aimed at both upgrading existing office space and delivering structural refurbishments that can increase the volume of lettable accommodation."

The scheme is due to be completed in autumn 2016.

(LM)

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Lakeside HireT & D Glazing And Installation LimitedThink Construction Skills Ltd.Stuart CanvasAqua Direct LtdEfco UK LtdBRICOFLOR UKBuckleys Mobile Crane ServicesSG-S (Silent Gliss Spares/Systems)St John Ambulance (NI)