Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

15/07/2015

Casella Launches Dust Sampling Apex2 Range

Construction News Image
Casella has launched Apex2, a range of next generation personal sampling pumps that provides accurate and reliable monitoring of exposure to dust in a variety of industrial workplaces.

These advanced pumps are ergonomically designed to ensure better wearer acceptance, whilst providing exceptional performance, great functionality and connectivity, and simplicity of reporting.

The Apex2 range includes three separate models - the Apex 2, Apex 2 Plus and Apex 2 Pro, which feature different functionality to meet varying requirements.

All three models are designed to be unobtrusive to the wearer and the task that they are performing. However, in the event that a worker removes the pump, this will be registered via a motion sensor that provides data to confirm if the pump has been worn and therefore confirm the validity of the sample.
-- Advertisement --
hss



The Apex 2 Plus and Apex 2 Pro models enable remote monitoring on smartphone and tablets as they both connect with the new easy to use Casella Airwave app via Bluetooth 4.0 technology.

This free app enables those responsible for monitoring to assess the sampling run without disturbing the wearer of the pump as well enabling them to control the pump from a smart device. Simple and easy to use, the app provides near real-time status updates and is designed to allow collected data to be emailed alongside photos and notes – adding context to the data and further simplifying the reporting process.

"The Apex2 range of personal sampling pumps truly are an industry first. The Bluetooth connectivity, the app and the built-in motion sensor differentiate this advanced technology from all other market offerings," said Andrea Bowen, Technical Product Manager at Casella.

"Occupational hygienists can be confident that the new pumps not only save time and effort, but also deliver better quality data than ever before."

The Apex2 range of personal sampling pumps are part of Casella’s latest occupational hygiene solutions that also include the recently launched dBadge 2. This next generation noise dosimeter also connects with a smartphone app to enable noise measurement and reporting in real time and without disturbance to workforces.

For more information on the innovative range of Apex2 personal sampling pumps for dust, please click here.

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Lakeside HireBRICOFLOR UKThink Construction Skills Ltd.Aqua Direct LtdEfco UK LtdStuart CanvasT & D Glazing And Installation LimitedThe Chiltern Lift Company LtdYorkshire Loft Ladders LtdRKP Access Platforms