Construction News
06/10/2015
Mace To Deliver £25m UCL Student Centre
Mace has been appointed to deliver a new £25 million Student Centre for the University College London (UCL).
The six floor facility has been designed by Nicholas Hare Architects.
It is to include 1,000 study places for students, a Student Enquiries Centre, a cafe and a space for exhibitions.
The development is at the heart of the university's campus in Bloomsbury and set between the UCL Bloomsbury Theatre and listed buildings.
Mace will therefore need to maintain circulation around the site for students and staff throughout construction.
Terry Spraggett, Mace Business Unit Director for the Public Sector, said: "We're delighted to have been appointed to deliver a building that will have a really positive impact on thousands of students for generations to come. The project plays to our strengths of working within constrained sites and using innovative methods of construction to mitigate the impact of our work on the surrounding community."
The London Borough of Camden's Planning Committee has resolved to grant planning permission and works are due to start this autumn, with the main construction works due to start in summer 2016.
The project will be completed by autumn 2018.
(LM/CD)
The six floor facility has been designed by Nicholas Hare Architects.
It is to include 1,000 study places for students, a Student Enquiries Centre, a cafe and a space for exhibitions.
The development is at the heart of the university's campus in Bloomsbury and set between the UCL Bloomsbury Theatre and listed buildings.
Mace will therefore need to maintain circulation around the site for students and staff throughout construction.
Terry Spraggett, Mace Business Unit Director for the Public Sector, said: "We're delighted to have been appointed to deliver a building that will have a really positive impact on thousands of students for generations to come. The project plays to our strengths of working within constrained sites and using innovative methods of construction to mitigate the impact of our work on the surrounding community."
The London Borough of Camden's Planning Committee has resolved to grant planning permission and works are due to start this autumn, with the main construction works due to start in summer 2016.
The project will be completed by autumn 2018.
(LM/CD)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i