Construction News
30/10/2015
University Of Sussex To Build £49m Sciences Building
Architects have begun working on designs for a new biomedical sciences building at the University of Sussex.
The £49m project includes a proposed refurbishment of the Genome building along with a connected new building spread over three and a half storeys.
With designs still in development, it is hoped the new building will contain:
• Teaching laboratories and spaces for Life Sciences students, including those studying on the proposed new Pharmacy degree course.
• A Bio Innovation Centre, bringing leading researchers from Sussex together with industry.
• A new Cellular and Molecular Neuroscience Centre.
• An expansion of the world-renowned Genome Damage and Stability Centre.
• An expanded Sussex Centre for Advanced Microscopy.
• A new Medicinal Chemistry and Drug Discovery Centre.
• A new joint Medical School/Life Sciences Screening and Target Discovery Centre.
• A café and social meeting spaces for staff and students.
Professor Michael Davies, Pro-Vice-Chancellor (Research), said: "To build on this important work and explore the new frontiers of biomedicine, we are planning to create a state-of-the-art teaching and research facility that will bring all biomedical researchers at Sussex under one roof."
In addition, Balfour Beatty Student Accommodation (BBSA) was appointed earlier this year as the preferred bidder for the development and operation of a new student accommodation in the East Slope housing area.
This project will incorporate 2,000 new bedrooms on the site.
A new building for the Students' Union (SU) could also potentially be built on the site, with the SU and the University agreeing plans for a new building in March 2015.
Planning applications will be submitted to Brighton & Hove City Council some time during spring 2016.
In addition, the University will also apply for permission to demolish the Mantell building. If approved, this is likely to be done around summer 2016.
(LM/MH)
The £49m project includes a proposed refurbishment of the Genome building along with a connected new building spread over three and a half storeys.
With designs still in development, it is hoped the new building will contain:
• Teaching laboratories and spaces for Life Sciences students, including those studying on the proposed new Pharmacy degree course.
• A Bio Innovation Centre, bringing leading researchers from Sussex together with industry.
• A new Cellular and Molecular Neuroscience Centre.
• An expansion of the world-renowned Genome Damage and Stability Centre.
• An expanded Sussex Centre for Advanced Microscopy.
• A new Medicinal Chemistry and Drug Discovery Centre.
• A new joint Medical School/Life Sciences Screening and Target Discovery Centre.
• A café and social meeting spaces for staff and students.
Professor Michael Davies, Pro-Vice-Chancellor (Research), said: "To build on this important work and explore the new frontiers of biomedicine, we are planning to create a state-of-the-art teaching and research facility that will bring all biomedical researchers at Sussex under one roof."
In addition, Balfour Beatty Student Accommodation (BBSA) was appointed earlier this year as the preferred bidder for the development and operation of a new student accommodation in the East Slope housing area.
This project will incorporate 2,000 new bedrooms on the site.
A new building for the Students' Union (SU) could also potentially be built on the site, with the SU and the University agreeing plans for a new building in March 2015.
Planning applications will be submitted to Brighton & Hove City Council some time during spring 2016.
In addition, the University will also apply for permission to demolish the Mantell building. If approved, this is likely to be done around summer 2016.
(LM/MH)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a