Construction News
14/10/2016
Student Homes Complete At University Of Cumbria
Work on new student accommodation at the University of Cumbria is now complete.
Keepmoat worked alongside the University to deliver 11 bed and two eight-bedroom town houses for 71 students in Ambleside.
The contractor used Structural Insulated Panels (SIPs) to complete the scheme in time for students arriving this month.
The use of SIPs reduces on-site labour, minimises on-site disruption, creates safer sites and reduces waste on site, providing lower energy and fuel bills.
In addition, local slate was used for the roofs render and local wall hung slate to the elevation and roughcast render to hatch existing buildings within the Lake District National Park.
Frank Mondino, area director for Keepmoat in the North West said: "We're delighted to have delivered a project, which stretches far beyond constructing the student housing. The off-site method enabled us to keep local disruption to a minimum.
"Additionally, the SIPs panels provided a cost effective, environmentally friendly and labour saving alternative to traditional methods, enabling us to source local products and provide employment and training opportunities for local subcontractors – something which is incredibly important to us."
Janet Whitworth, Chief Operating Officer for the University, added: "We are delighted with our new student accommodation delivered by Keepmoat. Keepmoat stepped in during January 2016 to help us deliver this project with extremely tight deadlines as we needed the rooms ready for students arriving in October."
(LM/CD)
Keepmoat worked alongside the University to deliver 11 bed and two eight-bedroom town houses for 71 students in Ambleside.
The contractor used Structural Insulated Panels (SIPs) to complete the scheme in time for students arriving this month.
The use of SIPs reduces on-site labour, minimises on-site disruption, creates safer sites and reduces waste on site, providing lower energy and fuel bills.
In addition, local slate was used for the roofs render and local wall hung slate to the elevation and roughcast render to hatch existing buildings within the Lake District National Park.
Frank Mondino, area director for Keepmoat in the North West said: "We're delighted to have delivered a project, which stretches far beyond constructing the student housing. The off-site method enabled us to keep local disruption to a minimum.
"Additionally, the SIPs panels provided a cost effective, environmentally friendly and labour saving alternative to traditional methods, enabling us to source local products and provide employment and training opportunities for local subcontractors – something which is incredibly important to us."
Janet Whitworth, Chief Operating Officer for the University, added: "We are delighted with our new student accommodation delivered by Keepmoat. Keepmoat stepped in during January 2016 to help us deliver this project with extremely tight deadlines as we needed the rooms ready for students arriving in October."
(LM/CD)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i