Following the busy Christmas Period, it can be nice to give the house a new look to carry forward into the New Year.
Blueprint Joinery thinks installing new stair cladding can give your staircase, and your entire home, a new lease of life.
Once you have picked out your stair cladding, you are going to want to install it on your staircase. DIY can be daunting even to the handiest man or woman, so Blueprint Joinery have put together a simple step-by-step guide on how to install your new staircase parts:
Prepare
Preparation is key, whatever you are doing. Before you go to put in your new cladding, you are going to want to ensure that the existing steps are clean, smooth and dry. Remove any old nails that may be present and gently sand each step. It is also recommended to sand all of the tread and risers before fitting to your staircase.
Measuring
It is important to measure each part accurately, otherwise you risk ruining your cladding before it has even made it onto your staircase.
Measure the bullnose protrusion, beginning from the face of the riser to the outermost point of the bullnose. Once you have done this, screw it into place on the existing risers.
Glueing and Fitting
Measure each part twice before cutting in order to avoid making errors and rendering the cladding unusable. Once you are happy with the measurements and have cut the pieces accurately, dry fit the Klad onto the steps and make any necessary adjustments.
Now it is time to apply a flexible polymer adhesive, using around a 10mm bead, onto the step. Place the tread gently onto the step and ensure that the riser fits snuggly into the groove on the underside of the tread.
Fit risers and treads one at a time. Do not attempt to rush glueing the parts down as it is important to place them in gently.
Finishing
Once all the risers and treads have been fitted and glued into place, you have successfully completed the installation of your new stair cladding.
Installing stair cladding can be a fairly simple exercise, as long as you know what you are doing.
If you feel that the New Year is the right time to take out the old and bring in the new, get in contact with Blueprint Joinery. They will be more than happy to discuss the staircase cladding options that are available to you.
For more information, call 01691 671020 or visit www.blueprintjoinery.com
Construction News
24/01/2017
New Stair Cladding Can Breathe Life Into Home - Blueprint Joinery


17/04/2025
Willmott Dixon has been selected by Oldham Council to build a new Visitor Centre and Forestry Skills Centre at Northern Roots, the UK's largest urban farm and eco-park.
The development marks a major milestone in the transformation of 160 acres of green space at the heart of Oldham, part of the coun

17/04/2025
A groundbreaking ceremony has officially marked the commencement of construction for Versa, a state-of-the-art laboratory facility at King's Cross.
The project, which is being delivered by Morgan Sindall Construction, has been commissioned by Kadans Science Partner, a prominent European investor s

17/04/2025
A major milestone has been reached on Skanska's A428 improvement scheme, as the project team connected the new A428 and B1040 roads over a newly constructed bridge and opened it to traffic last weekend.
The achievement marks a crucial step forward in the project, enabling access to part of the main

17/04/2025
Our welfare unit hire division offers innovative ecowelfare units ready to be delivered nationwide and available in a range of configurations to accommodate 7, 12, or 15 persons with our most popular unit being our 12ft model fitted with advanced solar panels means there is no noise or vibrations f

17/04/2025
Huddersfield Station will temporarily close from Saturday 30 August to Monday 29 September 2025 to allow for a critical phase of engineering work as part of the Transpennine Route Upgrade (TRU).
The closure will enable extensive track and platform remodelling at the Grade I listed station, which ha

17/04/2025
Visitors to Mumbles over the Easter holidays can now enjoy the transformed promenade, as major upgrades under the Mumbles Coastal Protection Project near completion.
Contractors have begun laying a durable buff-coloured top surface, replacing the previously installed black Tarmac. The fresh finish

17/04/2025
Herefordshire Council has secured £1 million in funding from the government’s Public Sector Decarbonisation Scheme, to redevelop Hereford's Museum and Art Gallery into one of the most energy-efficient heritage public buildings in the UK.
The funding will be used to install a low carbon heating syst

17/04/2025
David Lloyd Leisure, Europe's leading health, fitness and wellness group, has submitted a planning application to Wirral Council for a new club at Wirral Waters.
The proposed club, set to create up to 100 permanent jobs upon completion, will be located at Peel Waters’ Bidston Dock site off Wallasey

16/04/2025
Pennyfarthing Homes has officially broken ground at Danes Park in New Milton, launching construction on a significant new residential development that will deliver 164 homes.
To mark the milestone, directors from Pennyfarthing Homes welcomed Councillor Steve Davies, Portfolio Holder for Housing and

16/04/2025
GMI Construction Group is celebrating the official opening of Dakota Newcastle, the North East's first Dakota Hotel, situated on Newcastle's Quayside.
The 118-room luxury boutique hotel, located at St Anne's Wharf, has welcomed its first guests and is poised to become a major addition to the region