Construction News
28/09/2017
New £5.7m Learning Centre Opens At Leeds Trinity University
A new £5.7 million learning centre facility has been opened at Leeds Trinity University.
The Andrew Kean Learning Centre extension was officially unveiled on Wednesday, 27 September.
Partners of the extension scheme included contractors Morgan Sindall, architects Jefferson Sheard and management consultant Turner & Townsend.
Features of the facility include:
• Flexible IT rooms featuring suites of PCs that can be lowered into the desks to create flat working spaces
• A collaboration room with bespoke desks that integrate with other tables to provide flexibility depending on group sizes
• Social study space for students to work in small groups and deliver presentations
Mark Joyce, Director of Information Services at Leeds Trinity University, said: "Creating the best student experience is something we are absolutely committed to at Leeds Trinity. We want our students to exercise a choice in where, when and how they manage their learning, so we actively encourage student-led enquiry.
"We want our students to work collaboratively and encourage group work. And we have a clear vision for the way innovative teaching can be supported by relevant technology and modern, flexible teaching spaces – which is why we're so proud of the learning and teaching environments offered in the newly extended learning centre."
(LM)
The Andrew Kean Learning Centre extension was officially unveiled on Wednesday, 27 September.
Partners of the extension scheme included contractors Morgan Sindall, architects Jefferson Sheard and management consultant Turner & Townsend.
Features of the facility include:
• Flexible IT rooms featuring suites of PCs that can be lowered into the desks to create flat working spaces
• A collaboration room with bespoke desks that integrate with other tables to provide flexibility depending on group sizes
• Social study space for students to work in small groups and deliver presentations
Mark Joyce, Director of Information Services at Leeds Trinity University, said: "Creating the best student experience is something we are absolutely committed to at Leeds Trinity. We want our students to exercise a choice in where, when and how they manage their learning, so we actively encourage student-led enquiry.
"We want our students to work collaboratively and encourage group work. And we have a clear vision for the way innovative teaching can be supported by relevant technology and modern, flexible teaching spaces – which is why we're so proud of the learning and teaching environments offered in the newly extended learning centre."
(LM)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a