A major milestone has been reached on the HS2's high speed rail link project in London.
After a nine-month demolition of the former carriage sheds at Euston station, the site of approach tunnels for the London's HS2 terminal was revealed.
CSJV managed the demolition works along with Keltbray. Specialist teams used drones to survey the inside of the Victorian structure, before taking the fragile roof structure apart. In total, more than 7,000 glazing panels had to be removed from the 250m long building. The team then used cranes to remove the 27 large 50m-long steel trusses which supported the ceiling.
At Euston, HS2 will deliver eleven new platforms in two phases, more than doubling capacity at the station, as well as providing a new concourse and expanded Underground station, linked for the first time, to the nearby Euston Square tube station.
Twin 13 mile (21km) long tunnels, the biggest tunnelling project since Crossrail, will take the 360km/h trains out of London via a new station at Old Oak Common linked to Crossrail. At the southern end, a tunnel portal will be built on the site of the carriage sheds, just south of Mornington Street Bridge.
Tunnelling teams are now expected on site next year.
Welcoming the progress, HS2's London Programme Director, Rob Carr said: "The demolition of the old carriage sheds marks an important step forward for the project, clearing the way for the start of construction works next year, and the delivery of one of the most exciting new stations on the HS2 route. I'd like to congratulate the team on a job well done and look forward to moving ahead to the next stage of the project."
Peter Jones, CSJV Programme Director, added: "The CSJV team, consisting of people employed from the local area and other experienced professionals, alongside Keltbray have worked carefully and efficiently to ensure that this structure has been demolished safely. It marks a great milestone in the construction of HS2 and shows the fantastic progress that we are making in Euston and across Area South."
(CM/MH)
Construction News
04/10/2018
Major Milestone Reached On HS2 Project


04/04/2025
A major new multi-generational housing scheme is set to take shape in Congleton after the McGoff Group secured unanimous planning approval for its proposed development on Morley Drive, the former site of John Morley Limited.
Approved at a recent planning committee meeting, the joint application fro

04/04/2025
GMI Construction Group has broken ground on a new £17 million purpose-built student accommodation (PBSA) development on Foss Islands Road, marking its third major student housing project in York.
The five-storey scheme, developed in partnership by Urbium Capital and Harrogate-based Gregory Properti

04/04/2025
Network Rail has reopened a railway crossing at Vernatts Drain in Lincolnshire, using cutting-edge technology to ensure safer crossings for pedestrians and cyclists.
The crossing, which had been temporarily closed during the construction of the Spalding Western Relief Road, has now been upgraded wi

04/04/2025
Construction has officially begun on a landmark maritime training facility in Whitby that aims to position the town as a key player in the UK's offshore renewable energy and maritime industries.
Willmott Dixon has been appointed to deliver the £9.6 million Whitby Maritime Training Hub, a cutting-ed

04/04/2025
London Luton Airport has received the green light from the UK Government to increase its annual passenger capacity from 19 million to 32 million, in a decision expected to transform the town's economy and create thousands of new jobs.
The expansion proposal, brought forward by Luton Rising, the air

04/04/2025
Essential Green Skills, part of the Essential Site Skills Group, is encouraging commercial property owners to act now to improve their Energy Performance Certificate (EPC) ratings ahead of proposed tightening of Minimum Energy Efficiency Standards (MEES), which could require a minimum EPC rating of

04/04/2025
M.A Humm Quantity Surveying & Estimating Ltd has been delivering comprehensive preconstruction solutions since 2008.
Specialising in full estimating services, detailed and bespoke quantity surveying services, precise measurement and Bills of Quantities, and meticulous project planning, the company

04/04/2025
AE Racking Installations Ltd, a leading provider of racking systems and storage solutions, is proud to offer a wide range of services to meet the unique needs of both residential and commercial clients.
Specialising in the installation, dismantling, and relocation of various racking systems, AE Ra

04/04/2025
If you've been wanting to give your home an update without breaking the bank, then you need luxury vinyl click flooring!
Vinyl has come a long way from the low-quality flooring of the past, and it´s now extremely durable and also comes in a large number of colours and styles to suit your taste.
V

03/04/2025
Galliford Try's Investments business has received planning permission for a major Private Rental Sector (PRS) development at Grafton Gate in Central Milton Keynes, set to transform the city's skyline with a 33-storey residential tower.
The 599 Grafton Gate scheme will deliver 302 new homes, offerin