Construction News
23/01/2019
Mecalac Commences Production Of MDX Cabbed Site Dumpers
![Construction News Image](https://www.construction.co.uk/newsimages/1_254998_Mecalac-MDX.jpg)
Mecalac Construction Equipment UK has commenced production on its new MDX cabbed site dumper range, less than a year after it debuted at the INTERMAT exhibition.
The range aims to set the standards in site safety and is available in both six and nine-tonne payloads (6MDX and 9MDX).
For the 6MDX, an operating weight of 4,950kg ensures great manoeuvrability, while boasting a top speed of 25kph for improved productivity. The 9MDX offers similarly impressive statistics, with a narrow body width for effective operation in tight spaces and tall operating height for best-in-class visibility and ground clearance.
Both models adopt a highly-efficient 3.4L, 55kw Perkins 854 IIIB-compliant engine, generating 424Nm of torque. DPF exhaust after-treatment (with passive regeneration) ensures both models meet international emissions standards, while next generation Power Brakes, driven by the main hydraulic system, deliver significant improvement in pedal feel and braking effort.
The range also features optional air conditioning and an all-new dashboard design.
High-visibility access steps ensure safe entry and exit for operators, while flashing green seatbelt beacons, LED work lights and protected tail lights ensure each model is both visible on site and suitable for both day and night operation.
Each MDX model is fitted as standard with Mecalac's Shield technology packs to further enhance site dumper safety for operators nationwide. Available on ROPS machine with stage V.
The MDX cabbed site dumper range is manufactured at Mecalac's UK production facility in Coventry.
Each model is available through approved dealers nationwide.
(CM/MH)
The range aims to set the standards in site safety and is available in both six and nine-tonne payloads (6MDX and 9MDX).
For the 6MDX, an operating weight of 4,950kg ensures great manoeuvrability, while boasting a top speed of 25kph for improved productivity. The 9MDX offers similarly impressive statistics, with a narrow body width for effective operation in tight spaces and tall operating height for best-in-class visibility and ground clearance.
Both models adopt a highly-efficient 3.4L, 55kw Perkins 854 IIIB-compliant engine, generating 424Nm of torque. DPF exhaust after-treatment (with passive regeneration) ensures both models meet international emissions standards, while next generation Power Brakes, driven by the main hydraulic system, deliver significant improvement in pedal feel and braking effort.
The range also features optional air conditioning and an all-new dashboard design.
High-visibility access steps ensure safe entry and exit for operators, while flashing green seatbelt beacons, LED work lights and protected tail lights ensure each model is both visible on site and suitable for both day and night operation.
Each MDX model is fitted as standard with Mecalac's Shield technology packs to further enhance site dumper safety for operators nationwide. Available on ROPS machine with stage V.
The MDX cabbed site dumper range is manufactured at Mecalac's UK production facility in Coventry.
Each model is available through approved dealers nationwide.
(CM/MH)
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a