Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,062 companies....

Construction News

28/03/2019

Buyer's Guide To A Loft Hatch With Ladder

Construction News Image
When it comes to fitting a new loft hatch, whether it is a direct replacement or if you are looking to change the size of your current structural opening (hole in the ceiling), Trade Access Panels can provide bespoke insulated Loft Hatches to suit almost any requirement, including both Fire or Non-Fire Rated hatches and those with Youngman ladders or Zip-Ladders attached.

I myself (Emma) have recently had a bespoke loft hatch made and installed for my home. The original loft hatch was wooden in construction and was extremely tired with a very old-fashioned architrave trim. The wooden ladder was, well, battered and unsafe to say the least! It was also a rather complicated loft hatch to manufacture due to the picture frame needing to be different sizes on each side (not a standard 25mm picture frame/surround as with most hatches) to suit the original hole in the ceiling.
-- Advertisement --
hss



We decided to opt for a Metal Door with Picture Frame (different sizes as mentioned) and dust primed for onsite decoration so that when we paint the ceiling, we can simply paint the hatch and ceiling at the same time. We had considered a beaded frame which we would plaster/skim over however due to the original loft hatch/hole being so old we decided that using the picture frame option to cover the imperfections would be most appropriate on this occasion.

Unfortunately, a standard Youngman ladder would not be suitable on this occasion as the loft itself is converted and there is a wooden element which means that there is not enough room for the ladder to fold correctly. Therefore, we opted for a Zip-Ladder instead which is not usually required for a domestic property as it is ideally suited for the commercial due to its sturdy and professional construction.

The loft hatch and ladder were fitted with ease and I have to say the finished result is perfect both aesthetically and about ease of use. I am only 5'5" and therefore I required the 500mm extended Tee-Key to enable me to open the hatch without needing a ladder to reach the hatch.

Please bear us in mind for all projects that may arise. If you have any loft requirements then get in touch with one of our dedicated sales team who will be glad to assist you sales@tradeaccesspanels.co.uk – 01922 500145.

Latest Construction News

17/04/2025
Willmott Dixon has been selected by Oldham Council to build a new Visitor Centre and Forestry Skills Centre at Northern Roots, the UK's largest urban farm and eco-park. The development marks a major milestone in the transformation of 160 acres of green space at the heart of Oldham, part of the coun
17/04/2025
A groundbreaking ceremony has officially marked the commencement of construction for Versa, a state-of-the-art laboratory facility at King's Cross. The project, which is being delivered by Morgan Sindall Construction, has been commissioned by Kadans Science Partner, a prominent European investor s
17/04/2025
A major milestone has been reached on Skanska's A428 improvement scheme, as the project team connected the new A428 and B1040 roads over a newly constructed bridge and opened it to traffic last weekend. The achievement marks a crucial step forward in the project, enabling access to part of the main
17/04/2025
Our welfare unit hire division offers innovative ecowelfare units ready to be delivered nationwide and available in a range of configurations to accommodate 7, 12, or 15 persons with our most popular unit being our 12ft model fitted with advanced solar panels means there is no noise or vibrations f
17/04/2025
Huddersfield Station will temporarily close from Saturday 30 August to Monday 29 September 2025 to allow for a critical phase of engineering work as part of the Transpennine Route Upgrade (TRU). The closure will enable extensive track and platform remodelling at the Grade I listed station, which ha
17/04/2025
Visitors to Mumbles over the Easter holidays can now enjoy the transformed promenade, as major upgrades under the Mumbles Coastal Protection Project near completion. Contractors have begun laying a durable buff-coloured top surface, replacing the previously installed black Tarmac. The fresh finish
17/04/2025
Herefordshire Council has secured £1 million in funding from the government’s Public Sector Decarbonisation Scheme, to redevelop Hereford's Museum and Art Gallery into one of the most energy-efficient heritage public buildings in the UK. The funding will be used to install a low carbon heating syst
17/04/2025
David Lloyd Leisure, Europe's leading health, fitness and wellness group, has submitted a planning application to Wirral Council for a new club at Wirral Waters. The proposed club, set to create up to 100 permanent jobs upon completion, will be located at Peel Waters’ Bidston Dock site off Wallasey
16/04/2025
Pennyfarthing Homes has officially broken ground at Danes Park in New Milton, launching construction on a significant new residential development that will deliver 164 homes. To mark the milestone, directors from Pennyfarthing Homes welcomed Councillor Steve Davies, Portfolio Holder for Housing and
16/04/2025
GMI Construction Group is celebrating the official opening of Dakota Newcastle, the North East's first Dakota Hotel, situated on Newcastle's Quayside. The 118-room luxury boutique hotel, located at St Anne's Wharf, has welcomed its first guests and is poised to become a major addition to the region
Efco UK LtdStuart CanvasAqua Direct LtdBRICOFLOR UKLakeside HireT & D Glazing And Installation LimitedCleanroom Shop UKOpaque Decorators LtdRT Farm & Industrial Buildings LtdWatchtower Security Solutions United Kingdom Limited