Sieger Systems have announced the launch of the world's tallest thermally broken, aluminium bi-folding door, available exclusively to IQ Glass in the UK.
The Sieger Super Lux Bi-folding Door is a fully tested bi-folding door system, able to achieve opening bi-fold doors from 3m to 5m tall. The unprecedented opening heights are possible thanks to the integrated sliding wind post between each bi-folding pair.
This latest advance in building envelope design has been born from the market's call for bigger glass units, taller openings and higher performance. The aluminium profiles contain a full thermal break, allowing the bifolding door to maintain high levels of thermal insulation with typical Uw values from 1.6 W/m2K. The system has been fully tested for air permeability, water resistance and wind loading.
Dan Borthwick, Commercial Manager at IQ said: "This is the next generation in bifolding doors. My clients are always asking for taller doors and bigger openings. Normally we can only achieve this with sliding doors. Now we can use bifolding doors to create these double height openings."
Shirley Fluin, Showroom Manager at IQ added: "Bi-folding doors are the most popular product clients come to view in the showroom. But sometimes the traditional systems provide limitations in design, this includes opening heights widths. The new Super Lux Bifold is going to revolutionise this market, allowing clients to achieve the design they want without compromise."
The Sieger Super Lux is part of the new range of luxury aluminium systems available from Sieger. It is based on the Sieger Lux Bifold which boast the slimmest sightlines on the market with a 30mm thermally broken aluminium profile.
Construction News
24/04/2019
Sieger Systems Introduces 'World's Tallest' Bi-Folding Door


17/04/2025
Willmott Dixon has been selected by Oldham Council to build a new Visitor Centre and Forestry Skills Centre at Northern Roots, the UK's largest urban farm and eco-park.
The development marks a major milestone in the transformation of 160 acres of green space at the heart of Oldham, part of the coun

17/04/2025
A groundbreaking ceremony has officially marked the commencement of construction for Versa, a state-of-the-art laboratory facility at King's Cross.
The project, which is being delivered by Morgan Sindall Construction, has been commissioned by Kadans Science Partner, a prominent European investor s

17/04/2025
A major milestone has been reached on Skanska's A428 improvement scheme, as the project team connected the new A428 and B1040 roads over a newly constructed bridge and opened it to traffic last weekend.
The achievement marks a crucial step forward in the project, enabling access to part of the main

17/04/2025
Our welfare unit hire division offers innovative ecowelfare units ready to be delivered nationwide and available in a range of configurations to accommodate 7, 12, or 15 persons with our most popular unit being our 12ft model fitted with advanced solar panels means there is no noise or vibrations f

17/04/2025
Huddersfield Station will temporarily close from Saturday 30 August to Monday 29 September 2025 to allow for a critical phase of engineering work as part of the Transpennine Route Upgrade (TRU).
The closure will enable extensive track and platform remodelling at the Grade I listed station, which ha

17/04/2025
Visitors to Mumbles over the Easter holidays can now enjoy the transformed promenade, as major upgrades under the Mumbles Coastal Protection Project near completion.
Contractors have begun laying a durable buff-coloured top surface, replacing the previously installed black Tarmac. The fresh finish

17/04/2025
Herefordshire Council has secured £1 million in funding from the government’s Public Sector Decarbonisation Scheme, to redevelop Hereford's Museum and Art Gallery into one of the most energy-efficient heritage public buildings in the UK.
The funding will be used to install a low carbon heating syst

17/04/2025
David Lloyd Leisure, Europe's leading health, fitness and wellness group, has submitted a planning application to Wirral Council for a new club at Wirral Waters.
The proposed club, set to create up to 100 permanent jobs upon completion, will be located at Peel Waters’ Bidston Dock site off Wallasey

16/04/2025
Pennyfarthing Homes has officially broken ground at Danes Park in New Milton, launching construction on a significant new residential development that will deliver 164 homes.
To mark the milestone, directors from Pennyfarthing Homes welcomed Councillor Steve Davies, Portfolio Holder for Housing and

16/04/2025
GMI Construction Group is celebrating the official opening of Dakota Newcastle, the North East's first Dakota Hotel, situated on Newcastle's Quayside.
The 118-room luxury boutique hotel, located at St Anne's Wharf, has welcomed its first guests and is poised to become a major addition to the region