Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,281 companies....

Construction News

16/05/2019

Introducing A New Way To Manage Building Evacuations

Construction News Image
Being caught up in a fire, explosion, bomb threat or similar, is a very rare occurrence for most of us. Often, in a real time emergency evacuation, people will do the wrong thing or simply not know what to do at all.

Emergency drills should be held to practice the fire and evacuation routine at least twice a year, and in high-risk premises more often. These drills will indicate the success or otherwise of the fire routine and emergency plan, which enable companies to make the appropriate adjustments.

We can instil the need to refrain from delaying the evacuation - by leaving personal belongings behind, not wandering floors or attempting to return for any reason, but when faced with the thought of imminent danger human behaviour can be very unpredictable.

Once out of the building, many organisations conduct evacuation role calls (name calls) to ensure everyone is out, but these can be time consuming and mistakes can be made. Should anyone be missing, a role call does not give a clear indication of where that person might be.

This can all delay and falsify any rescue attempts by the emergency services.
-- Advertisement --
hss



But there is another way……

Marsden Fire Safety are delighted to introduce TagEvac, a revolutionary evacuation management system that gives staff and Emergency Services real time information about a buildings evacuation process, eliminates the need for time consuming role calls and helps to eliminate human error.

How does it work?

Firstly, the building is divided into evacuation zones and a 'TAG Station', complete with removable magnetic tags, is placed outside each zone. A fire warden (or wardens) will then be appointed for these areas.

In an emergency, the zone is visually checked by the appointed person, using the sweep method of evacuation. When clear, the tag is removed from its 'TAG Station' to reveal a red zone checked panel. The tag is then taken to the central control board, confirming at both locations that the zone is clear.

Simply put, while you're in the building you can tell in an instant which zones have been checked, by having a quick look at its tag station and once you're safely outside, a quick glance at the control board means you have a reliable overview of the situation.

This information can be easily relayed to emergency services to allow them to prioritise their efforts accordingly.

TagEvac is deliberately low-tech and intuitive to help avoid 'system failure' in an emergency. It's easy to install, simplifies training of Fire Warden and helps organisations achieve best practise.

That's why it is the trusted management solution for industry leaders such as Coca-Cola, Lloyds of London, Nationwide, London Underground and The National Archives.

Tagevac is available as an 'off the shelf' self-customisable system or we can work with you to develop a custom built system to fit your specific needs - whether it be in a single site or across multiple locations.

For more information or to discuss requirements contact:

Marsden Fire Safety

www.marsden-fire-safety.co.uk

info@marsden-fire-safety.co.uk

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
Lakeside HireThink Construction Skills Ltd.Efco UK LtdStuart CanvasT & D Glazing And Installation LimitedAqua Direct LtdBRICOFLOR UKSpecial FormworkApollo Scaffolding Ties LtdCTE Construction Tooling & Equipment