Construction Phase Plan? Why Do I Need One?

Construction News Image
A Construction Phase Plan is a legal document that outlines how you will manage the safety and health of people during the construction phase of a project.

Many people believe that only large design and build projects are required to have a Construction Phase Plan, but this is not true at all.

The complexity of a construction project will determine the level of detail you need to have in this essential and legally required document.

If a sole trader plasterer was to plaster a wall in a domestic property, they would still need a formal Construction Phase Plan. However, this could be a single page of paper without too much technical information.

When should you create your Construction Phase Plan?

The Construction Phase Plan is created before any construction work is carried out. If the project has multiple contractors and is considered large enough, there may be a principal designer who provides another document called "Pre-Construction Information" to the contractor carrying out the construction project.

By setting out the health and safety arrangements and requirements for the project, every worker involved in the development can work together to reach high safety standards and project safety goals.

So, I just need to create it once, right?

The Construction Phase Plan MUST be prepared before any construction work begins on site. However, as important as the Construction Phase Plan is, it's not a one-off document that can be left aside throughout your development until the project is finished. The Construction Phase Plan needs to be constantly revisited as work progresses and develops, making note of any changes in plans or arrangements.

For larger projects, items to consider such as fire management, traffic and pedestrian segregation or even first aid arrangements may need to change.
-- Advertisement --
hss



For smaller projects this may not always be the case, but the fact you have a Construction Phase Plan in place in the first instance is a good start.

I am the client. Do I have to be involved in the Construction Phase Plan?

As the client, it is typical that you have significant influence on a project. Afterall, you control the finances, project timescales and appointments. You may also have knowledge of any planning restrictions, local services, that you should make available to the contractor. Prior to the construction phase of the project starting, you must make sure the contractor you have appointed has created the Construction Phase Plan, and that it is sufficient to meet the needs of the project. You may want to bring in an experienced professional to support you with this.

I am the architect / designer. Do I have to be involved in the Construction Phase Plan?

As a designer on the project, you may have critical information that the contractor needs to create an effective Construction Phase Plan. This may include locations of utilities, detailed ground surveys, engineer reports. All of these documents are likely to contain critical information that can influence the management of health and safety on site.

In some circumstances, you may be appointed as the Principal Designer. This is a specific duty under CDM regulations that require you to provide Pre-Construction Information to the contractor before any construction works commence. You may want to consult with an experienced professional on the duties of a Principal Designer.

I am the contractor. Where can I find an example Construction Phase Plan?

If you are completing only small works such as plastering, plumbing, brickwork for domestic clients (a house that the client lives in as their main residence) then there is a CDM Wizard tool you can download for free here:

• Apple devices here

• Android devices here

• Laptop / Computer here

For more technical projects that require multiple trades and a principal contractor (the single contractor who is responsible for managing health and safety on the project) then you can find specific information here and go to page 77.

If you are unsure you may want to speak with an experienced professional on how to manage site safety as a contractor.

If you would like to know more about managing construction health and safety then please feel free to drop us a line for an informal chat. We are always happy to discuss projects with property developers, facilities managers, architects and contractors.

For more information on the Construction Phase Plan, call 0330 0948 848 (Option 1).

For information visit www.better-safety.co.uk.

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
Aqua Direct LtdBRICOFLOR UKLakeside HireEfco UK LtdStuart CanvasThink Construction Skills Ltd.T & D Glazing And Installation LimitedRapid Access LtdFrametech Essex LtdKAS Shopfittings