Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,281 companies....

Construction News

20/12/2019

New A14 Bypass Opens Six Months Ahead Of Schedule

Construction News Image
A section of the new £1.5 billion A14 bypass has been opened six months ahead of schedule.

The A14 Huntingdon bypass opened to the public last week, forming part of a major scheme to upgrade 21 miles of the A14 between Cambridge and Huntingdon.

A joint venture of Balfour Beatty, Costain and Skanska is delivering the project on behalf of Highways England.

Details have now been released of how the road layout has changed, and what drivers can expect on the new road between Ellington and Swavesey.

The junction numbers on the A14 between Ellington and Bar Hill have changed as there are fewer junctions than on the old A14. All A14 junctions east of and including Girton, as well as the A1 junctions, will maintain their existing junction numbers.

Drivers travelling eastbound on the new bypass will still have to join a section of 40mph narrow lanes roadworks from the Swavesey junction, so should look out for the signs when they approach the area.

The old A14 has now been closed in both directions between Godmanchester and the Spittals interchanges, to allow Highways England to start work to remove the existing viaduct over the railway and build new link roads into Huntingdon town centre. This closure will remain in place until 2022. Once work is completed, a new road layout will open with links to and from the old A14 in and out of Huntingdon instead of a viaduct over the railway station. Get more information about what is happening in Huntingdon.
-- Advertisement --
hss



While all roads in and out of Huntingdon will remain open, there will be some overnight closures to complete this work, which will be communicated in advance and diversions signposted clearly. Road users who would normally travel from Huntingdon to Cambridge will now use the westbound A141 (former A14 west of Huntingdon) from Spittals roundabout towards Brampton Hut, access the A1 southbound and then join the new A14 eastbound free flow link at Brampton interchange.

Drivers seeking to access towns and villages along the A1307 (old A14 east of Huntingdon) between Godmanchester and Swavesey can do so by exiting the new A14 at its A1198, Ermine Street junction (junction 23), travelling north on the A1198 and joining the eastbound A1307.

Drivers seeking to travel from Cambridge towards Huntingdon will now head westbound on the new A14 to Brampton Interchange, use the free flow link to access the A1 northbound, before exiting at Brampton Hut and travelling east on the A141 (old A14) to to enter Huntingdon via Spittals roundabout.

The new A14 was designed with safety as the number one priority and its design is simple and intuitive. As with any major road, the main things to remember are to keep left unless overtaking, not to drive under a Red X, stick within the speed limit and know what to do if you breakdown. A red roundel around a speed limit means it is mandatory.

Slow moving vehicles will be prohibited from using the new bypass and will be directed to use alternative local access roads. It is not always possible to join or leave the new road in all directions at each junction. This is to ensure that long distance traffic on the A14 uses the most appropriate junction for its destination, avoiding smaller roads through local communities.

Work on the rest of the project, between Swavesey and Milton, continues and is on schedule to completed as planned by December 2020.

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
Efco UK LtdStuart CanvasLakeside HireThink Construction Skills Ltd.T & D Glazing And Installation LimitedBRICOFLOR UKAqua Direct LtdSpecial FormworkApollo Scaffolding Ties LtdCTE Construction Tooling & Equipment