Construction News
18/02/2020
Major Road Improvement Project Approved In West Sussex
A new £17 million road improvement scheme for West Sussex has been approved by Transport Minister, Baroness Vere.
The Minister announced a major investment in the A2300 improvement scheme, which will reduce congestion, improve reliability for drivers and support growth in the region.
The A2300 improvement, worth £22 million in total, will cut congestion and improve safety by converting a 2.5km section of the existing road to a dual carriageway between the A23 and the proposed Northern Arc roundabout.
The scheme links Burgess Hill to the A23/M23 and is an important route for commuters, who often face congestion and delays. The upgrades will also see the addition of new walking and cycling paths and will allow over 3,500 new houses to be built along the route, by providing a key link between the planned development at Burgess Hill and the London to Brighton corridor.
Transport Minister Baroness Vere said: "This government is committed to boosting transport links for communities up and down the country.
"This transformative road scheme will not only save drivers time, but will also mean more homes, more shared footpaths, and more cycleways – boosting journeys for all."
At its peak, it is estimated over 20,000 vehicles use the road daily. Without the upgrade, traffic flows are expected to grow by 40% over the next 2 decades.
West Sussex County Council's Cabinet Member for Highways and Infrastructure Roger Elkins said: "This is the excellent news we have been waiting for and puts the scheme on course for starting on site this spring.
"The scheme will widen around 2.5km of single-lane road to a dual carriageway, helping to unlock significant development opportunities, reduce congestion, and bring many other benefits to the area, including providing new walking and cycling facilities."
Work on the scheme is expected to start in the spring, with the road expected to be open in winter 2021.
The new road is just one of a number of projects in West Sussex including the Crawley Growth Programme and the major station improvements at Gatwick.
This is the latest in the government's drive to improve links and level up infrastructure for communities and follows the announcement of a £5 billion funding package to overhaul bus and cycle links around the country.
MM
The Minister announced a major investment in the A2300 improvement scheme, which will reduce congestion, improve reliability for drivers and support growth in the region.
The A2300 improvement, worth £22 million in total, will cut congestion and improve safety by converting a 2.5km section of the existing road to a dual carriageway between the A23 and the proposed Northern Arc roundabout.
The scheme links Burgess Hill to the A23/M23 and is an important route for commuters, who often face congestion and delays. The upgrades will also see the addition of new walking and cycling paths and will allow over 3,500 new houses to be built along the route, by providing a key link between the planned development at Burgess Hill and the London to Brighton corridor.
Transport Minister Baroness Vere said: "This government is committed to boosting transport links for communities up and down the country.
"This transformative road scheme will not only save drivers time, but will also mean more homes, more shared footpaths, and more cycleways – boosting journeys for all."
At its peak, it is estimated over 20,000 vehicles use the road daily. Without the upgrade, traffic flows are expected to grow by 40% over the next 2 decades.
West Sussex County Council's Cabinet Member for Highways and Infrastructure Roger Elkins said: "This is the excellent news we have been waiting for and puts the scheme on course for starting on site this spring.
"The scheme will widen around 2.5km of single-lane road to a dual carriageway, helping to unlock significant development opportunities, reduce congestion, and bring many other benefits to the area, including providing new walking and cycling facilities."
Work on the scheme is expected to start in the spring, with the road expected to be open in winter 2021.
The new road is just one of a number of projects in West Sussex including the Crawley Growth Programme and the major station improvements at Gatwick.
This is the latest in the government's drive to improve links and level up infrastructure for communities and follows the announcement of a £5 billion funding package to overhaul bus and cycle links around the country.
MM
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a