Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,263 companies....

Construction News

30/09/2020

There Is Always A Solution At Projector!

Construction News Image
Just one of the times where Projector Lifting did what others either couldn't, or wouldn't.

A pump specialist got in touch with us last year and they were at the point of pulling their hair out.

They had several large, heavy water pumps that needed to be replaced in London… and nobody could figure out how to get the job done without major disruption.

The pumps were below ground, under a prestigious building and surrounded by large bore pipework, ducting and latterly constructed frames and structures. It wasn't a heavy lift, relative to the work we regularly do, but with the location and obstructions, it was a bit of a nightmare!

The pump specialists had spoken with no end of different heavy lifting, machinery removal and relocation companies who, having seen the layout, the plans and the site photo’s, declined to submit a proposal.
-- Advertisement --
hss



Well, at Projector Lifting Service we are known for liking "a bit of a challenge". So we dispatched a surveyor to get a proper look at the project and charged him with coming up with a viable solution.

Having measured everything, thought it through and discussed it with our engineering team it was decided that we'd had similar issues and that we could complete the project to remove the old pumps and install the new without the need to close down the building and dismantle any of the localised fittings.

The method statement, risk assessment and plan were all completed and off went our engineers. One day later, the old pumps were out, the new pumps were installed, and it was business as usual in this London location.

It just took some application of experience, an understanding of the challenges and obstacles and the use of specialist gantry equipment to complete this tricky project. The client was delighted as it was completed with very little disruption, in reasonable time and to their budget.

Now, what's next?

www.projectorlifting.co.uk

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
Think Construction Skills Ltd.Aqua Direct LtdEfco UK LtdLakeside HireBRICOFLOR UKT & D Glazing And Installation LimitedStuart CanvasLondon Stone Conservation LtdCable Glands Uk LtdGolmar Systems UK Ltd.