Construction News
12/11/2020
Caddick Construction Completes Work On £154m Scheme In Manchester
Caddick Construction has completed work on the £154 million Moda Angel Gardens B2R scheme in Manchester.
The company has officially handed over the 35-storey neighbourhood to Moda Living.
Caddick originally took over the contract in 2018, just months into the build after incumbents Carillion went into liquidation. Caddick's intervention kept the scheme open and also helped safeguard 500 jobs. The build-to-rent project remains one of the largest outside of London and also includes 20,000 sq. ft of commercial space.
Originally built on the site of Manchester's first steam-powered cotton mill, Moda Angel Gardens now offers 466 high quality homes, ranging from studios to three-beds. Residents also have access to shared amenities including: a 24-hour gym and concierge service, parking, communal lounges including a library, cinema room and private dining room, co-working space and a multi-use roof terrace including a football pitch.
On the corner of Miller Street and Rochdale Road, it sits across from Victoria Station and forms a key part of the exciting 20-acre NOMA neighbourhood in the city centre.
Adrian Dobson, Caddick Construction's Managing Director, said: "This has been a momentous scheme in every sense; from its size and quality of the build right through to the physical contribution it is making on a gateway district of Manchester's city centre.
"We are delighted to be able to hand over this prestigious project and the final result is testament to the team who have worked incredibly hard to deliver a truly iconic neighbourhood."
Architects were Ryder Architecture Ltd, with structural engineering provided by Burohappold Engineering. Quantity surveyors were Spring & Co Ltd.
The company has officially handed over the 35-storey neighbourhood to Moda Living.
Caddick originally took over the contract in 2018, just months into the build after incumbents Carillion went into liquidation. Caddick's intervention kept the scheme open and also helped safeguard 500 jobs. The build-to-rent project remains one of the largest outside of London and also includes 20,000 sq. ft of commercial space.
Originally built on the site of Manchester's first steam-powered cotton mill, Moda Angel Gardens now offers 466 high quality homes, ranging from studios to three-beds. Residents also have access to shared amenities including: a 24-hour gym and concierge service, parking, communal lounges including a library, cinema room and private dining room, co-working space and a multi-use roof terrace including a football pitch.
On the corner of Miller Street and Rochdale Road, it sits across from Victoria Station and forms a key part of the exciting 20-acre NOMA neighbourhood in the city centre.
Adrian Dobson, Caddick Construction's Managing Director, said: "This has been a momentous scheme in every sense; from its size and quality of the build right through to the physical contribution it is making on a gateway district of Manchester's city centre.
"We are delighted to be able to hand over this prestigious project and the final result is testament to the team who have worked incredibly hard to deliver a truly iconic neighbourhood."
Architects were Ryder Architecture Ltd, with structural engineering provided by Burohappold Engineering. Quantity surveyors were Spring & Co Ltd.
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i