Balfour Beatty VINCI SYSTRA, in partnership with HS2, are set to commence permanent works on the west London 'superhub' station, Old Oak Common, following approval of the work by Transport Secretary, Grant Shapps.
Shapps visited the ten-hectare site to meet the team working there and give the thumbs up for work to begin on the biggest newly-built railway station in the UK.
Over 2,300 jobs will be supported on the site at peak construction, and over 250 apprenticeships will be created. There is also a commitment to recruiting local candidates of all ages and backgrounds for the project.
The Transport Secretary's green light means that work will commence with the construction of a 1.8km long underground diaphragm wall around what will become the station's 'underground box', where six HS2 platforms will sit to accommodate trains serving the Midlands and the North. Pilling rigs will also install 160 reinforced concrete columns inside the wall to help form the box and support the structure.
Giving the green light for work to begin, Transport Secretary Grant Shapps said: "The start of permanent works at the largest train station ever built in the UK in one go, Old Oak Common, marks yet more progress in delivering HS2, the high-speed, high-capacity and low carbon railway that will form the backbone of our national transport network.
"This 'super-hub' station shows our Plan for Jobs in action - kickstarting major regeneration, creating 2,300 jobs and 250 apprenticeships in construction – and underlines this Government's determination to Build Back Better."
Once complete, HS2's Old Oak Common station will offer unrivalled connectivity, with fourteen new platforms; six HS2 platforms offering high speed services to the North and Midlands, four Crossrail – or Elizabeth Line – platforms, and four conventional rail platforms, which will be served by trains to Wales and the South West.
Following the first phase of construction to create the 750,000m3 box, work on the eight overground platforms will begin. Over 1600 concrete piles will be installed into the ground on which the station superstructure and overground platforms will sit.
Nigel Russell, Project Director, Balfour Beatty VINCI SYSTRA said: "This incredible milestone is testament to the dedication of our team, who have worked tirelessly to make this moment happen. With many more years of work to do, we are proud to be delivering one of Britain's largest, connected and sustainable railway stations whilst simultaneously stimulating the local economy.
"Through our work, we are providing numerous employment opportunities for local people, as well as offering 250 apprentices the opportunity to start their career on the UK's most exciting engineering project."
Bringing the station together will be the station's immense roof, covering the area of over three football pitches. The lightweight roof structure has been designed to minimize the use of materials and allow as much natural light in which reduces the carbon impact of the station. The environmental credentials of the station will be boosted by solar panels covering the roof, generating a supply of renewable energy for the station. The station design development has been led by engineering professional services consultancy WSP with architectural support from WilkinsonEyre.
HS2 CEO, Mark Thurston, welcoming the Transport Secretary on site said: "The start of permanent works at Old Oak Common station, our first station under construction, is a significant step for Phase One of HS2, as we deliver world-leading engineering to create what will arguably be one of the best-connected railway super-hubs in the UK.
"Over 2,300 jobs will be supported to build the new station; part of the 22,000 jobs being created to build the new high-speed railway between London and the West Midlands, and emphasising the key role HS2 is playing in Britain's economic recovery after the pandemic."
The Balfour Beatty VINCI SYSTRA joint venture is leading the construction work on the ten-hectare west London site. The station's size and scale means it will boast some incredible stats and features including:
• 73,000 tonnes of steel
• 13,000 square metres of glass
• 2,720 square metres of solar panels on the roof
• 53 lifts and 44 escalators
• 550 cycle spaces
• 10,000 energy efficient LED light bulbs
With over 250,000 passengers using the station every day, Old Oak Common will become one of the country's most vital transport hubs and a catalyst for economic regeneration for the area and the rest of the UK. Plans to transform the wider area around the station, a former railway and industrial site, are being led by the Old Oak and Park Royal Development Corporation (OPDC) and they project that tens of thousands of new jobs and homes will be created around the new HS2 station.
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
21/11/2024
Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024
At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...