Upgrading Lifts To Firefighting Or Evacuation
In this blog, Stannah will cover how lifts typically work and the implications for upgrading lifts to fire-fighting or evacuation capabilities.
How do passenger lifts typically work in the event of a fire or evacuation?
Typically lifts are not used in the event of a fire or evacuation - most go to the ground and shut down in the event of an alarm (with doors open and calls disabled). This behaviour of lifts in the event of a fire (BS 81-73) enables all lift passengers to evacuate the building and for fire-fighters to ensure there is no one trapped inside.
Can a lift be used as part of your building evacuation plans?
In general, no, it isn't appropriate to use lifts when there is a fire. There's the danger of people getting trapped in an immobilised lift, hence why a standard is in place.
It's also true for platform lifts, which do not conform to the same standards, the concern remains of lift users becoming trapped between floors.
If the desire is to use a lift as part of an evacuation strategy, a thorough risk assessment and consultation with your lift service and insurance companies is required.
Are there any lifts you can use in the event of a fire? Or for evacuation?
There are certain types of passenger lift that can aid the fire and rescue service and emergency evacuation in the event of trouble. These lifts operate as standard passenger lifts with the capability to switch into an emergency state if required.
What's a fire-fighting lift?
As far back as the 1940s, the use of lifts with dedicated control features for firefighters was recognised in the UK and has been essential in high-rise buildings. We've had a standard for these lifts since the 1980s.
Modern fire-fighting lifts have additional protection, with controls that enable them to be used under the direct control of the fire and rescue service to contain and eventually quell a fire.
British Standard EN81-72 compliant fire-fighting lifts feature:
• An interface between the lift control, fire detection and alarm system
• Trap doors and ladders for rescue operations
• Electrical components in the shaft and on the car are protected against water
• Emergency intercom system and lift operation
• Separate power supply to enable the lift to remain in use even if building electrics are compromised
A fire-fighting lift is required in new housing if the building has a floor more than 18 metres above, or more than 10 metres below, the fire-service vehicle access level.
A fire-fighting lift may be provided as part of a management plan for evacuating people in some circumstances. In such cases, the lift installation may need to be appropriately located and protected, e.g. refuge areas at landings.
What's an evacuation lift?
Evacuation lifts can aid in evacuating those less ambulant in the event of an emergency (as part of an evacuation strategy). They enable the use of the passenger lift by a designated warden to evacuate those less ambulant. Evacuation lifts comply with BS 81-76 lift regulations, with features requirements similar to fire-fighting, but excluding water protection. Typically, they are larger capacity passenger lifts to evacuate disabled users, patients in beds or stretchers, e.g. hospitals, large nursing homes.
Can an existing lift be upgraded to evacuation? Or fire-fighting?
For existing tower block lifts, where there is an emergency provision requirement, there is guidance on modernising in BS 8899: Improvement of fire-fighting and evacuation provisions in existing lifts.
It is a fundamental assumption of BS 8899 that the elements of the building design necessary for the fire protection and safety of the lift, including secondary power supplies, are provided as part of the building design.
Typically, the only way to tell if a lift upgrade is possible is with a site visit: to assess both the current lift specification and whether the building design will provide at least the level of protection and features necessary to protect the lift specified.
Due to the exacting requirements, there are often limitations that prevent full or even partial compliance. These can only be assessed on a case by case basis.
How do I go about upgrading my lift?
As lift upgrades are typically in occupied buildings, a lift company will work with property owners and tenants. Ensuring lift work is carried out safely, causes minimum disruption and provides a means of access for all building users - including temporary stairlifts to aid movement if required.
The proper maintenance, service and repair of existing lift stock plays an important role in enabling people to flow in apartment blocks. Not to mention that housing lifts are often in constant use! To prevent upset tenants, we'd always recommend regular and thorough lift inspections with 24hr service cover.
www.stannahlifts.co.uk
How do passenger lifts typically work in the event of a fire or evacuation?
Typically lifts are not used in the event of a fire or evacuation - most go to the ground and shut down in the event of an alarm (with doors open and calls disabled). This behaviour of lifts in the event of a fire (BS 81-73) enables all lift passengers to evacuate the building and for fire-fighters to ensure there is no one trapped inside.
Can a lift be used as part of your building evacuation plans?
In general, no, it isn't appropriate to use lifts when there is a fire. There's the danger of people getting trapped in an immobilised lift, hence why a standard is in place.
It's also true for platform lifts, which do not conform to the same standards, the concern remains of lift users becoming trapped between floors.
If the desire is to use a lift as part of an evacuation strategy, a thorough risk assessment and consultation with your lift service and insurance companies is required.
Are there any lifts you can use in the event of a fire? Or for evacuation?
There are certain types of passenger lift that can aid the fire and rescue service and emergency evacuation in the event of trouble. These lifts operate as standard passenger lifts with the capability to switch into an emergency state if required.
What's a fire-fighting lift?
As far back as the 1940s, the use of lifts with dedicated control features for firefighters was recognised in the UK and has been essential in high-rise buildings. We've had a standard for these lifts since the 1980s.
Modern fire-fighting lifts have additional protection, with controls that enable them to be used under the direct control of the fire and rescue service to contain and eventually quell a fire.
British Standard EN81-72 compliant fire-fighting lifts feature:
• An interface between the lift control, fire detection and alarm system
• Trap doors and ladders for rescue operations
• Electrical components in the shaft and on the car are protected against water
• Emergency intercom system and lift operation
• Separate power supply to enable the lift to remain in use even if building electrics are compromised
A fire-fighting lift is required in new housing if the building has a floor more than 18 metres above, or more than 10 metres below, the fire-service vehicle access level.
A fire-fighting lift may be provided as part of a management plan for evacuating people in some circumstances. In such cases, the lift installation may need to be appropriately located and protected, e.g. refuge areas at landings.
What's an evacuation lift?
Evacuation lifts can aid in evacuating those less ambulant in the event of an emergency (as part of an evacuation strategy). They enable the use of the passenger lift by a designated warden to evacuate those less ambulant. Evacuation lifts comply with BS 81-76 lift regulations, with features requirements similar to fire-fighting, but excluding water protection. Typically, they are larger capacity passenger lifts to evacuate disabled users, patients in beds or stretchers, e.g. hospitals, large nursing homes.
Can an existing lift be upgraded to evacuation? Or fire-fighting?
For existing tower block lifts, where there is an emergency provision requirement, there is guidance on modernising in BS 8899: Improvement of fire-fighting and evacuation provisions in existing lifts.
It is a fundamental assumption of BS 8899 that the elements of the building design necessary for the fire protection and safety of the lift, including secondary power supplies, are provided as part of the building design.
Typically, the only way to tell if a lift upgrade is possible is with a site visit: to assess both the current lift specification and whether the building design will provide at least the level of protection and features necessary to protect the lift specified.
Due to the exacting requirements, there are often limitations that prevent full or even partial compliance. These can only be assessed on a case by case basis.
How do I go about upgrading my lift?
As lift upgrades are typically in occupied buildings, a lift company will work with property owners and tenants. Ensuring lift work is carried out safely, causes minimum disruption and provides a means of access for all building users - including temporary stairlifts to aid movement if required.
The proper maintenance, service and repair of existing lift stock plays an important role in enabling people to flow in apartment blocks. Not to mention that housing lifts are often in constant use! To prevent upset tenants, we'd always recommend regular and thorough lift inspections with 24hr service cover.
www.stannahlifts.co.uk
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i