Construction News
09/08/2021
Willmott Dixon To Develop Passivhaus Leisure Centre
![Construction News Image](https://www.construction.co.uk/newsimages/1_276972_WillmottDixon.jpg)
Construction firm Willmott Dixon has been selected by Spelthorne Borough Council to deliver a Passivhaus leisure centre that aims to be one of the most advanced, energy efficient leisure facilities in the world.
It will be the first wet and dry leisure centre to achieve the Passivhaus standard in Greater London, and will be designed to consume up to 70% less energy compared with a standard new building, optimising natural daylight and integrating photovoltaic panels to generate energy from renewable sources.
When complete, the centre will include an eight lane 25m main pool, learner pool, splash pad and spa. Further sports facilities include a 6-court sports hall, three squash courts, 950 square metres of fitness space, two studios, one spin studio and a multi-use room which combines to create two further badminton courts.
There will also be an open plan café and reception space, along with a roof terrace overlooking four small-sided 3G football pitches.
The project will utilise Willmott Dixon's Passivhaus expertise, which has seen the company deliver the UK’s first Passivhaus ‘Plus’ primary school, Hackbridge Primary School, and the UK’s largest Passivhaus secondary school, Harris Academy, both in Sutton. It also completed the George Davies Centre for University of Leicester in 2015, another major Passivhaus building.
Chair of Spelthorne Borough Council’s Community Wellbeing Committee, Cllr Sandra Dunn, said: "I am very excited that this important project has been given approval to proceed to the next stage. Feedback from residents has heavily influenced the location, design and facilities and we have worked hard to ensure the new building meets the Gold standard for environmental credentials.
"This is going to be a fantastic hub for all the community, offering a great range of sports facilities and activities for everyone to enjoy. I am sure it will make a huge difference in encouraging residents to maintain healthy lifestyles. I look forward to seeing the plans take shape."
It will be the first wet and dry leisure centre to achieve the Passivhaus standard in Greater London, and will be designed to consume up to 70% less energy compared with a standard new building, optimising natural daylight and integrating photovoltaic panels to generate energy from renewable sources.
When complete, the centre will include an eight lane 25m main pool, learner pool, splash pad and spa. Further sports facilities include a 6-court sports hall, three squash courts, 950 square metres of fitness space, two studios, one spin studio and a multi-use room which combines to create two further badminton courts.
There will also be an open plan café and reception space, along with a roof terrace overlooking four small-sided 3G football pitches.
The project will utilise Willmott Dixon's Passivhaus expertise, which has seen the company deliver the UK’s first Passivhaus ‘Plus’ primary school, Hackbridge Primary School, and the UK’s largest Passivhaus secondary school, Harris Academy, both in Sutton. It also completed the George Davies Centre for University of Leicester in 2015, another major Passivhaus building.
Chair of Spelthorne Borough Council’s Community Wellbeing Committee, Cllr Sandra Dunn, said: "I am very excited that this important project has been given approval to proceed to the next stage. Feedback from residents has heavily influenced the location, design and facilities and we have worked hard to ensure the new building meets the Gold standard for environmental credentials.
"This is going to be a fantastic hub for all the community, offering a great range of sports facilities and activities for everyone to enjoy. I am sure it will make a huge difference in encouraging residents to maintain healthy lifestyles. I look forward to seeing the plans take shape."
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a