Construction News
16/08/2021
Plans Submitted For Ecological Crematorium
A planning application for an ecological crematorium in East Cambridgeshire has been submitted.
The application will now go through the planning process which includes documents being validated.
The crematorium is proposed to be sited on the land which previously was used by Mepal Outdoor Centre. Following the closure of the centre in December 2016, the site was subject to multiple arson and vandalism incidents.
However, parts of the site have since been able to flourish, becoming home to locally and nationally important wildlife and biodiversity. This natural transformation means that its future use must respect and enhance the evolved ecological needs of the site.
The submission of the planning application follows a public survey which was undertaken at the start of 2021, inviting residents' thoughts about the proposed plans. As part of the planning application, a formal consultation process will now take place.
The application includes a main chapel and a small side chapel, an electric cremator emitting significantly less greenhouse gas emissions than other crematoria in the East of England, natural burial plots, a modular function building for the natural burial aspect, a pet cemetery located away from the other facilities and one acre of new planting including 57 new trees and 40 fruit trees.
Councillor Anna Bailey, Leader of East Cambridgeshire District Council, said: "Firstly I would like to thank residents for taking part in our survey on the proposals. We made a commitment to engage with communities on our proposals and we are now moving to the next step of consultation, through the planning application process.
"As well as providing a facility for residents that currently doesn’t exist in the district, we have been working to ensure that the proposal reflects our environmental vision for the district.
"This not only includes protecting the ecology that has flourished over the past 4 years but creating a proposal which is an exemplar sustainable development and gives back to the site through additional planting and ongoing sensitive management to enrich the area.
"We are also making good on our promise to deliver the maximum level of public access for recreational use of the site, which, as advised by The Wildlife Trust need to be low impact in order to respect and protect the wildlife and biodiversity that is flourishing there; I am pleased that the site will be available for dog walking, bird watching and fishing."
The proposed crematorium development, which will be confined to the existing footprint of buildings on the site, and other associated uses are not anticipated to result in any significant adverse residual effects to identified ecological assets which have been found as part of the Council’s ecology and biodiversity studies.
The application will now go through the planning process which includes documents being validated.
The crematorium is proposed to be sited on the land which previously was used by Mepal Outdoor Centre. Following the closure of the centre in December 2016, the site was subject to multiple arson and vandalism incidents.
However, parts of the site have since been able to flourish, becoming home to locally and nationally important wildlife and biodiversity. This natural transformation means that its future use must respect and enhance the evolved ecological needs of the site.
The submission of the planning application follows a public survey which was undertaken at the start of 2021, inviting residents' thoughts about the proposed plans. As part of the planning application, a formal consultation process will now take place.
The application includes a main chapel and a small side chapel, an electric cremator emitting significantly less greenhouse gas emissions than other crematoria in the East of England, natural burial plots, a modular function building for the natural burial aspect, a pet cemetery located away from the other facilities and one acre of new planting including 57 new trees and 40 fruit trees.
Councillor Anna Bailey, Leader of East Cambridgeshire District Council, said: "Firstly I would like to thank residents for taking part in our survey on the proposals. We made a commitment to engage with communities on our proposals and we are now moving to the next step of consultation, through the planning application process.
"As well as providing a facility for residents that currently doesn’t exist in the district, we have been working to ensure that the proposal reflects our environmental vision for the district.
"This not only includes protecting the ecology that has flourished over the past 4 years but creating a proposal which is an exemplar sustainable development and gives back to the site through additional planting and ongoing sensitive management to enrich the area.
"We are also making good on our promise to deliver the maximum level of public access for recreational use of the site, which, as advised by The Wildlife Trust need to be low impact in order to respect and protect the wildlife and biodiversity that is flourishing there; I am pleased that the site will be available for dog walking, bird watching and fishing."
The proposed crematorium development, which will be confined to the existing footprint of buildings on the site, and other associated uses are not anticipated to result in any significant adverse residual effects to identified ecological assets which have been found as part of the Council’s ecology and biodiversity studies.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a