Construction News
27/08/2021
Wye Valley NHS Trust Takes Steps To Lower Carbon Footprint
Wye Valley NHS Trust is to lower its carbon footprint as part of a £4.7 million energy upgrade at the Hereford County Hospital site, which is due to be completed this year.
The funding comes as part of a wider national decarbonisation plan supported by a grant scheme from The Department for Business Energy & Industrial Strategy (BEIS) delivered by Salix Finance* which helps the public sector work towards their net zero goals.
Centrica Business Solutions will deliver the multi-million pound upgrade to provide greener energy and efficiency to Hereford County Hospital and six of the older buildings on the site, including the Education and Development Centre, Post Graduate Medical Centre, Longfield House staff accommodation and Lionel Green building, which was previously used as nurses accommodation 20 years ago.
Work has already started with the installation of 3,170 low energy lights in the main hospital building. This will be followed by more than 300 rooftop solar panels, which will provide enough energy to power the equivalent of 27 UK homes per year. Modern switching mechanisms, 1,163 pipework insulation jackets and 263 metres of pipework lagging to reduce heat loss are also being installed in the buildings across the site.
A ground source heat pump network, which involves drilling 47 boreholes 200m into the ground – is also now being installed at locations around the hospital grounds. Nearly six miles long in total, this will pump water, naturally warmed by the earth, and convert it into usable heat for six of the buildings on the site.
The funding comes as part of a wider national decarbonisation plan supported by a grant scheme from The Department for Business Energy & Industrial Strategy (BEIS) delivered by Salix Finance* which helps the public sector work towards their net zero goals.
Centrica Business Solutions will deliver the multi-million pound upgrade to provide greener energy and efficiency to Hereford County Hospital and six of the older buildings on the site, including the Education and Development Centre, Post Graduate Medical Centre, Longfield House staff accommodation and Lionel Green building, which was previously used as nurses accommodation 20 years ago.
Work has already started with the installation of 3,170 low energy lights in the main hospital building. This will be followed by more than 300 rooftop solar panels, which will provide enough energy to power the equivalent of 27 UK homes per year. Modern switching mechanisms, 1,163 pipework insulation jackets and 263 metres of pipework lagging to reduce heat loss are also being installed in the buildings across the site.
A ground source heat pump network, which involves drilling 47 boreholes 200m into the ground – is also now being installed at locations around the hospital grounds. Nearly six miles long in total, this will pump water, naturally warmed by the earth, and convert it into usable heat for six of the buildings on the site.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a