HS2 has announced the shortlist of bidders to build the high speed rail project's network control centre and rolling stock maintenance depot.
The project will create around 500 long-term jobs in Birmingham’s Washwood Heath.
The contract – worth an estimated £275 million – will see the winning bidder work with HS2 Ltd to transform the 30 hectare brown field site into the nerve centre of the HS2 network.
The following bidders will be invited to tender:
• GÜLERMAK AĞIR SAN. İNŞAAT VE TAAH. A.Ş & Gulermak Sp z o.o.
• VINCI Construction UK Limited (t/a Taylor Woodrow) & Keltbray Limited
• VolkerFitzpatrick Ltd & VolkerRail Ltd
HS2's fleet of state-of-the-art high-speed trains will be serviced and maintained, 24 hours a day, seven days a week, from the Washwood Heath site - ready to provide an unparalleled level of frequency and reliability for passengers across the UK.
The depot will include a Rolling Stock Maintenance Building, Carriage Wash, Automatic Vehicle Inspection Building and 14 sidings where trains can be stored overnight.
Also on the same site will be the Network Integrated Control Centre, the centre of the network’s state-of-the-art signalling and control systems as well as office buildings for cleaners and drivers. In total, around 500 jobs are expected to be based across both the depot and control centre.
The Washwood Heath site was formerly home to the disused Metro-Cammell railway works which closed in 2004. A team from HS2’s enabling works contractor LM (Laing Murphy), completed the demolition of the buildings on the site last year, ready for the start of construction.
Once operational, Phase One and 2a will have a fleet of at least 54 trains which will be based at Washwood Heath. These 200m long units can be doubled up to create 400m long trains and will serve destinations beyond the HS2 network – like Liverpool, Preston, Carlisle and Glasgow - via a connection to the existing West Coast Main Line at Crewe.
Contracts are expected to be awarded in 2023.
Construction News
10/09/2021
Shortlist Of Bidders Announced For Washwood Heath Train Depot


17/04/2025
Willmott Dixon has been selected by Oldham Council to build a new Visitor Centre and Forestry Skills Centre at Northern Roots, the UK's largest urban farm and eco-park.
The development marks a major milestone in the transformation of 160 acres of green space at the heart of Oldham, part of the coun

17/04/2025
A groundbreaking ceremony has officially marked the commencement of construction for Versa, a state-of-the-art laboratory facility at King's Cross.
The project, which is being delivered by Morgan Sindall Construction, has been commissioned by Kadans Science Partner, a prominent European investor s

17/04/2025
A major milestone has been reached on Skanska's A428 improvement scheme, as the project team connected the new A428 and B1040 roads over a newly constructed bridge and opened it to traffic last weekend.
The achievement marks a crucial step forward in the project, enabling access to part of the main

17/04/2025
Our welfare unit hire division offers innovative ecowelfare units ready to be delivered nationwide and available in a range of configurations to accommodate 7, 12, or 15 persons with our most popular unit being our 12ft model fitted with advanced solar panels means there is no noise or vibrations f

17/04/2025
Huddersfield Station will temporarily close from Saturday 30 August to Monday 29 September 2025 to allow for a critical phase of engineering work as part of the Transpennine Route Upgrade (TRU).
The closure will enable extensive track and platform remodelling at the Grade I listed station, which ha

17/04/2025
Visitors to Mumbles over the Easter holidays can now enjoy the transformed promenade, as major upgrades under the Mumbles Coastal Protection Project near completion.
Contractors have begun laying a durable buff-coloured top surface, replacing the previously installed black Tarmac. The fresh finish

17/04/2025
Herefordshire Council has secured £1 million in funding from the government’s Public Sector Decarbonisation Scheme, to redevelop Hereford's Museum and Art Gallery into one of the most energy-efficient heritage public buildings in the UK.
The funding will be used to install a low carbon heating syst

17/04/2025
David Lloyd Leisure, Europe's leading health, fitness and wellness group, has submitted a planning application to Wirral Council for a new club at Wirral Waters.
The proposed club, set to create up to 100 permanent jobs upon completion, will be located at Peel Waters’ Bidston Dock site off Wallasey

16/04/2025
Pennyfarthing Homes has officially broken ground at Danes Park in New Milton, launching construction on a significant new residential development that will deliver 164 homes.
To mark the milestone, directors from Pennyfarthing Homes welcomed Councillor Steve Davies, Portfolio Holder for Housing and

16/04/2025
GMI Construction Group is celebrating the official opening of Dakota Newcastle, the North East's first Dakota Hotel, situated on Newcastle's Quayside.
The 118-room luxury boutique hotel, located at St Anne's Wharf, has welcomed its first guests and is poised to become a major addition to the region