Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

13/09/2021

Plans Submitted For Mixed-Use Development In Wembley

Construction News Image
Regal London has submitted plans for a mixed-use development on Fulton Road in Wembley.

The proposed scheme comprises 759 new homes across three distinct buildings together with more than 30,000 sq ft of flexible commercial space which is set to include retail, light industrial and leisure uses.

Regal London's plans will deliver a highly sustainable mixed-use development in line with the wider aspirations for the Wembley Growth Area in which the site is located.

The plot sits on the East side of Wembley Stadium, a key area which has yet to fully benefit from regeneration. The area's changing context means the proposed scheme would convert an underutilised plot to meet new local needs, including the provision of hundreds of thoughtfully designed new homes, more than a third of which will be affordable. This equates to 35% affordable housing measured by habitable room.
-- Advertisement --
hss



The high-quality contemporary commercial space has been designed to ensure maximum flexibility and to accommodate a range of operators. The space will incorporate a retail element as well as new employment floorspace that will be offered to a variety of prospective tenants, with flexibility as to the sizes of units. Regal London expects this will support up to 230 full time equivalent (FTE) jobs during the operational phase whilst 925 jobs will be created during the construction phase.

Regal London anticipates a start on site date in July 2022 with first occupation in the last quarter of 2025 and full practical completion at the beginning of 2027.

The architects and masterplanners for the scheme are JTP. The award-winning international placemaking practice has previously collaborated with Regal London to bring forward innovative and sustainable developments to sites across London.

New publicly accessible open space has been designed in collaboration with Bradley Murphy Design. Alongside the provision of podium and rooftop gardens for residents, over 40,000 sq ft of public realm is proposed at ground floor level around the buildings. The site will facilitate the delivery of a new west to east route from Fulton Road to Fourth Way, with enhancements to the environment alongside the Wealdstone Brook. Overall, the scheme provides an urban greening factor score of 0.47 and a large biodiversity net gain, reinforcing Regal London's sustainability commitments.

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
T & D Glazing And Installation LimitedBRICOFLOR UKThink Construction Skills Ltd.Efco UK LtdLakeside HireAqua Direct LtdStuart CanvasModel Signage SolutionsBrady Insurance Services LtdModel Safety