Construction News
30/09/2021
Work Starts On SECAmb's Ambulance, 999 And NHS Centre In Gillingham
![Construction News Image](https://www.construction.co.uk/newsimages/1_278749_Secamb.jpg)
Construction work has commenced on South East Coast Ambulance Service NHS Foundation Trust's (SECAmb's) new multi-purpose ambulance, 999 and NHS 111 centre in Gillingham.
The development will include 999 and 111 call centre operations as well as a Make Ready Centre. Building work at the Bredgar Road site follows planning permission being granted last year.
The contractor, Westridge Construction, is now on site carrying out groundworks ahead of construction. The centre is expected to become fully operational in Autumn 2022.
SECAmb's Make Ready vehicle preparation and maintenance system will occupy the two lower floors while staff currently based at the Trust's East 999 Emergency Operations Centre (EOC) in Coxheath and Trust NHS 111 staff, currently based in Ashford, Kent, will benefit from modern open-plan offices above.
Integrating both 999 and 111 services is a key part of SECAmb’s strategy to deliver more joined up integrated care and to increase efficiency. The development will also bring the east of SECAmb's region in line with its West Emergency Operations Centre (including NHS 111), based in Crawley, which opened in 2017.
SECAmb's Make Ready system, which is already in place across much of its region, is a vehicle preparation system which sees specialist teams of staff employed to clean, restock and maintain the Trust's fleet.
Ambulance crews currently starting and ending their shifts at Medway Ambulance Station in Chatham will, instead, start and finish at the new centre. They will then respond from ambulance community response posts across the region with suitable rest facilities for crews between calls and when on a break.
Staff based in Sheppey will continue to start and end their shifts from the ambulance station on the island, which has undergone a major refurbishment and upgrade to provide new educational and training facilities.
SECAmb currently operates nine Make Ready Centres across its region with Brighton the latest centre to open in December 2020.
The development will include 999 and 111 call centre operations as well as a Make Ready Centre. Building work at the Bredgar Road site follows planning permission being granted last year.
The contractor, Westridge Construction, is now on site carrying out groundworks ahead of construction. The centre is expected to become fully operational in Autumn 2022.
SECAmb's Make Ready vehicle preparation and maintenance system will occupy the two lower floors while staff currently based at the Trust's East 999 Emergency Operations Centre (EOC) in Coxheath and Trust NHS 111 staff, currently based in Ashford, Kent, will benefit from modern open-plan offices above.
Integrating both 999 and 111 services is a key part of SECAmb’s strategy to deliver more joined up integrated care and to increase efficiency. The development will also bring the east of SECAmb's region in line with its West Emergency Operations Centre (including NHS 111), based in Crawley, which opened in 2017.
SECAmb's Make Ready system, which is already in place across much of its region, is a vehicle preparation system which sees specialist teams of staff employed to clean, restock and maintain the Trust's fleet.
Ambulance crews currently starting and ending their shifts at Medway Ambulance Station in Chatham will, instead, start and finish at the new centre. They will then respond from ambulance community response posts across the region with suitable rest facilities for crews between calls and when on a break.
Staff based in Sheppey will continue to start and end their shifts from the ambulance station on the island, which has undergone a major refurbishment and upgrade to provide new educational and training facilities.
SECAmb currently operates nine Make Ready Centres across its region with Brighton the latest centre to open in December 2020.
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a