Construction News
18/11/2021
Beard Completes Work On £5m Building Scheme In Reading
Construction company Beard has completed work on a £5 million building project at a leading co-educational, independent day school in Reading.
The school formerly catered for pupils aged three to 13, but as a result of Beard's work, Crosfields School now has a new state-of-the-art senior school building and will have its first cohort of Year 11 pupils to sit their GCSEs in 2023.
During the project, Beard created a new front entrance, nine new classrooms, a staff area, medical centre, library, flexible performance space and a new café.
The school also holds charitable status, and is committed to reinvesting funds back into its facilities with recent projects including an artificial turf sports pitch, science labs, cricket pavilion, sports centre and swimming pool.
Craig Watson, Headmaster at Crosfields School said: "Parents and pupils wanted the choice to stay at the school beyond year eight, and this fantastic new building for our Senior pupils will mean that we can offer our broad and thorough education to many more students for years to come.
"We pride ourselves in offering the best environment for pupils to learn and develop in, and the new facilities will ensure that our students continue to thrive in an outstanding learning space."
Jamie Harwood, director for Beard's Swindon office, added: "One of the key aspects to this project was the close relationship with the client. Despite some hurdles to overcome, by working together and communicating openly, we delivered these exceptional new facilities in time for the children to start their new term.
"This project fits firmly into the Beard ethos that buildings are spaces for living, working, playing, performing and connecting.
"It's unquantifiable the impact these new buildings will have, the friendships that will be forged in them, and the education that takes place within them."
The school formerly catered for pupils aged three to 13, but as a result of Beard's work, Crosfields School now has a new state-of-the-art senior school building and will have its first cohort of Year 11 pupils to sit their GCSEs in 2023.
During the project, Beard created a new front entrance, nine new classrooms, a staff area, medical centre, library, flexible performance space and a new café.
The school also holds charitable status, and is committed to reinvesting funds back into its facilities with recent projects including an artificial turf sports pitch, science labs, cricket pavilion, sports centre and swimming pool.
Craig Watson, Headmaster at Crosfields School said: "Parents and pupils wanted the choice to stay at the school beyond year eight, and this fantastic new building for our Senior pupils will mean that we can offer our broad and thorough education to many more students for years to come.
"We pride ourselves in offering the best environment for pupils to learn and develop in, and the new facilities will ensure that our students continue to thrive in an outstanding learning space."
Jamie Harwood, director for Beard's Swindon office, added: "One of the key aspects to this project was the close relationship with the client. Despite some hurdles to overcome, by working together and communicating openly, we delivered these exceptional new facilities in time for the children to start their new term.
"This project fits firmly into the Beard ethos that buildings are spaces for living, working, playing, performing and connecting.
"It's unquantifiable the impact these new buildings will have, the friendships that will be forged in them, and the education that takes place within them."
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a