Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,263 companies....

Construction News

31/03/2022

CDE Unveils New AquaCycle A2500 Thickener

Construction News Image
CDE has unveiled its new AquaCycle A2500 thickener, the latest addition to its top-of-the-line water management and recycling systems.

With a capacity of 2500m³/hour, the new A2500 is CDE's largest and most advanced water management system to date.

It has been developed in response to calls from materials processors operating in high tonnage markets for water management solutions equipped to supply their operations with sufficient water supplies while ensuring optimal production efficiency, minimum loss of fines and maximum water recycling.

Darren Eastwood, Strategic Development Director at CDE, said: "It is increasingly important for materials processors to invest in an effective water management system that ensures a steady supply of clean water to their plants through cost-effective means.

"The continued advancement of our pioneering wet processing solutions and leading-edge water management systems is supporting operators working in the natural processing and waste recycling sectors worldwide to overcome the challenges of washing in water-pressured or water scarce areas today."
-- Advertisement --
hss



Where CDE bridged the gap in 2018 with the launch of its A900 and A1500, providing a median alternative to its 600m³/hour and 1500m³/hour models, the new A2500 expands the range with a 2500m³/hour option to fit the requirements of sites processing high tonnages. The increased capacity also provides a lower rise rate, enabling operators to process challenging, harder to settle materials.

Designed for easy use and safe access for efficient maintenance, it boasts the first lattice bridge structure on any CDE thickener. An integrated monorail also provides unrivalled access to the motorised rake, gearbox and motor.

With a sludge capacity of 125 tonnes/hour, the A2500 includes an adjustable rake lifting mechanism. Featuring passive torque control, the automatic raise and start sequence is designed to protect rakes from surge pressure from dense sludges. The rake itself has also been reimagined, with optimally spaced and redesigned blades for improved sludge conditioning.

Powered by the motorised rake arm, the introduction of a new floating scum scraper, which is independent of the rake’s height, allows for the easy removal of unwanted foam, oil and light weight trash. And, creating even radial flow to all regions of the A2500, a redesigned volute feedwell optimises the incoming flow for improved flocculant performance.

Another key feature of the new A2500 is its feed height. Sitting at almost 6.7 metres (6690mm), it simplifies upstream plant design complexity as it eliminates the need for expensive civils, helping to expedite the commissioning process of entire plant solutions.

With a tank diameter of 20 metres and a weight of 88 tonnes when empty and 1,150 tonnes when full, the A2500 features a small footprint whilst packing a punchy 2500m³/hour and a solids capacity of 125 tonnes/hour.

An alternative to water extraction from natural sources and the costly process of pumping water to the plant, CDE’s A2500, like the full AquaCycle range, significantly reduces costly water consumption by ensuring up to 90% of process water is recycled for immediate re-circulation.

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
Stuart CanvasLakeside HireEfco UK LtdBRICOFLOR UKAqua Direct LtdThink Construction Skills Ltd.T & D Glazing And Installation LimitedIron Works UK LtdHeritage Flooring UK LtdAdvanced Insulation Materials Ltd